If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445051301000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.786901,"lon":-114.60942,"icon":""}]} |
Location: 00/01-13-044-05W5/0 | |
Location Alias: 00/01-13-44-05 W5M | |
Location Alias 2: 00/01-13-044-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 05 | |
Section: 13 | |
County/Municipality: Clearwater County | |
Well Name: TAC PEMBINA 1-13-44-5 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0443575 | |
License Date: 2012-02-01 | |
License Status: Suspension | |
Spud Date: 2012-03-19 | |
Final Drill Date: 2012-03-25 | |
Well Total Depth: 3215.00 m | |
Surface Hole Latitude: 52.786901 | |
Surface Hole Longitude: -114.609420 |
Date | Event |
---|---|
2012-02-01 | Obtained License |
2012-03-20 | Surface Casing Operation Performed |
2012-03-21 | Well Log Performed |
2012-03-22 | Direction Drilling Operation Performed - Deviate |
2012-03-23 | Direction Drilling Operation Performed - Horizontal |
2012-03-25 | Finished Drilling |
2012-03-25 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-25 | Well Log Performed |
2012-03-25 | Well Mode changed to Drilled and Cased |
2012-03-26 | Production Casing Operation Performed |
2012-03-27 | Rig Released |
2012-04-01 | Well Log Performed |
2012-07-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-01 | Well Began Production |
2013-01-01 | Well Fluid changed to Crude Oil |
2013-01-01 | Well Mode changed to Flowing |
2013-09-01 | Well Fluid changed to Crude Oil |
2013-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-19 | Nabors Drilling Limited | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-22 | 1245.90 | Deviate (5 - 79 degrees) |
2012-03-23 | 1824.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-25 | Open Hole/Barefoot Completion | 3201.70 | 3215.00 | 0 |
2012-07-06 | Multi-Stage Fracture | 2663.50 | 2663.60 | 0 |
2012-07-07 | Multi-Stage Fracture | 2598.50 | 2598.60 | 0 |
2012-07-07 | Multi-Stage Fracture | 2533.60 | 2533.70 | 0 |
2012-07-07 | Multi-Stage Fracture | 2469.80 | 2469.90 | 0 |
2012-07-07 | Multi-Stage Fracture | 2405.80 | 2405.90 | 0 |
2012-07-07 | Multi-Stage Fracture | 2341.10 | 2341.20 | 0 |
2012-07-07 | Multi-Stage Fracture | 2276.30 | 2276.40 | 0 |
2012-07-07 | Multi-Stage Fracture | 2211.40 | 2211.50 | 0 |
2012-07-07 | Multi-Stage Fracture | 2146.60 | 2146.70 | 0 |
2012-07-07 | Multi-Stage Fracture | 2081.50 | 2081.60 | 0 |
2012-07-06 | Multi-Stage Fracture | 3183.30 | 3183.40 | 0 |
2012-07-07 | Multi-Stage Fracture | 2004.70 | 2004.80 | 0 |
2012-07-07 | Multi-Stage Fracture | 1939.40 | 1939.50 | 0 |
2012-07-06 | Multi-Stage Fracture | 3120.90 | 3121.00 | 0 |
2012-07-06 | Multi-Stage Fracture | 3048.40 | 3048.50 | 0 |
2012-07-06 | Multi-Stage Fracture | 2986.10 | 2986.20 | 0 |
2012-07-06 | Multi-Stage Fracture | 2918.70 | 2918.80 | 0 |
2012-07-06 | Multi-Stage Fracture | 2858.50 | 2858.60 | 0 |
2012-07-06 | Multi-Stage Fracture | 2793.50 | 2793.60 | 0 |
2012-07-06 | Multi-Stage Fracture | 2728.60 | 2728.70 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 4957 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-27 | No Incident Encountered | 0.00 | 0.00 |
2012-07-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]