X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445051404000

Well Details

Well ID: 0445051404000
Loading map...
Location: 00/04-14-044-05W5/0
Location Alias: 00/04-14-44-05 W5M
Location Alias 2: 00/04-14-044-05 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 05
Section: 14
County/Municipality: Clearwater County
Well Name: TAC HZ PEMBINA 4-14-44-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0474008
License Date: 2015-01-05
License Status: Issued
Spud Date: 2015-05-26
Final Drill Date: 2015-06-01
Well Total Depth: 3000.00 m
Surface Hole Latitude: 52.786512
Surface Hole Longitude: -114.609665

For data sources see[1][2]

Well History

Date Event
2015-01-05 Obtained License
2015-05-27 Direction Drilling Operation Performed - Deviate
2015-05-27 Surface Casing Operation Performed
2015-05-29 Direction Drilling Operation Performed - Horizontal
2015-05-31 Well Log Performed
2015-06-01 Finished Drilling
2015-06-01 Production Casing Operation Performed
2015-06-01 Well Mode changed to Drilled and Cased
2015-06-02 Rig Released
2015-06-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-15 Well Began Production
2015-06-15 Well Fluid changed to Crude Oil
2015-06-15 Well Mode changed to Flowing
2015-06-19 Well Fluid changed to Crude Oil
2015-06-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-05-26 Excalibur Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-05-27 658.20 Deviate (5 - 79 degrees)
2015-05-29 1802.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-06-13 Multi-Stage Fracture 2986.70 2986.80 0
2015-06-13 Multi-Stage Fracture 2359.40 2359.50 0
2015-06-13 Multi-Stage Fracture 2287.40 2287.50 0
2015-06-13 Multi-Stage Fracture 2215.40 2215.50 0
2015-06-13 Multi-Stage Fracture 2155.30 2155.40 0
2015-06-13 Multi-Stage Fracture 2081.40 2081.50 0
2015-06-13 Multi-Stage Fracture 2021.30 2021.40 0
2015-06-13 Multi-Stage Fracture 1947.40 1947.50 0
2015-06-13 Multi-Stage Fracture 1859.70 1859.80 0
2015-06-13 Multi-Stage Fracture 2936.60 2936.70 0
2015-06-13 Multi-Stage Fracture 2862.70 2862.80 0
2015-06-13 Multi-Stage Fracture 2788.80 2788.90 0
2015-06-13 Multi-Stage Fracture 2714.90 2715.00 0
2015-06-13 Multi-Stage Fracture 2641.00 2641.10 0
2015-06-13 Multi-Stage Fracture 2581.00 2581.10 0
2015-06-13 Multi-Stage Fracture 2507.10 2507.20 0
2015-06-13 Multi-Stage Fracture 2433.20 2433.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-06-13 2015-06-13 1,652 2,676 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 2.1011 N/A
Water Not Available 100 84.9779 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 13.8812 N/A
B-1008 Sanjel Bactericide/Biocide BNPD 52-51-7 100 0.0079 N/A
Methyl Alcohol 67-56-1 100 0.0079 N/A
SCC-1L Sanjel Clay Control No hazardous ingredients Not Available 100 0.1444 N/A
FRW-3 Sanjel Friction Reducer Isoparaffinic Solvent 64742-47-8 100 0.0396 N/A
Non-Hazardous Ingredients Not Available 100 0.0396 N/A
Surfactant 68131-40-8 100 0.0396 N/A
NE-5 Sanjel Surfactant Alkyl benzenesulfonic acid 68584-22-5 100 0.0835 N/A
Diethylenetriamine 111-40-0 100 0.0835 N/A
Isopropyl Alcohol 67-63-0 100 0.0835 N/A
Non-Hazardous Ingredients Not Available 100 0.0835 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-06-13 2015-06-13 Groundwater - Non-saline less than or equal to 150m deep 123
2015-06-13 2015-06-13 Surface Water - Runoff 1221
2015-06-13 2015-06-13 Surface Water - Lake 1226

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4361 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8631 0.0 0.0 0.0
2018 8746 0.0 0.0 0.0
2019 8740 0.0 0.0 0.0
2020 2147 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-02 No Incident Encountered 0.00 0.00
2015-06-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References