If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445051506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.791606,"lon":-114.645072,"icon":""}]} |
Location: 00/06-15-044-05W5/0 | |
Location Alias: 00/06-15-44-05 W5M | |
Location Alias 2: 00/06-15-044-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 05 | |
Section: 15 | |
County/Municipality: Clearwater County | |
Well Name: TAC ET AL PEMBINA 6-15-44-5 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0021675 | |
License Date: 1961-11-14 | |
License Status: Abandoned | |
Spud Date: 1961-11-20 | |
Final Drill Date: 1962-01-03 | |
Well Total Depth: 2252.20 m | |
Surface Hole Latitude: 52.791606 | |
Surface Hole Longitude: -114.645072 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-11-14 | Obtained License |
1961-11-28 | Lost Circulation Occurred |
1961-12-01 | Drill Stem Test Performed |
1961-12-10 | Lost Circulation Occurred |
1961-12-16 | Drill Stem Test Performed |
1961-12-17 | Drill Stem Test Performed |
1961-12-26 | Drill Stem Test Performed |
1962-01-03 | Finished Drilling |
1962-01-07 | Production Casing Operation Performed |
1962-01-15 | Well Mode changed to Drilled and Cased |
1962-03-08 | Perforation Treatment Performed - Jet Perforation |
1962-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-03-09 | Perforation Treatment Performed - Cement Squeeze |
1962-03-10 | Perforation Treatment Performed - Jet Perforation |
1962-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-01-10 | Well Began Production |
1968-01-10 | Well Fluid changed to Gas |
1968-01-10 | Well Mode changed to Flowing |
1968-04-05 | Perforation Treatment Performed - Nitrogen Treatment |
1989-10-19 | Perforation Treatment Performed - Cement Squeeze |
1989-10-19 | Plug Back Performed |
1989-10-27 | Perforation Treatment Performed - Jet Perforation |
1989-10-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-11-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-11-02 | Perforation Treatment Performed - Jet Perforation |
1989-11-02 | Plug Back Performed |
1989-11-02 | Well Fluid changed to Gas |
1989-11-02 | Well Mode changed to Abandoned |
1989-11-03 | Perforation Treatment Performed - Remedial Casing |
1989-11-03 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-03-08 | Perforation | 2158.30 | 2160.10 | 10 |
1989-10-27 | Perforation | 2158.00 | 2161.00 | 13 |
1989-10-30 | Acid Treatment | 2158.00 | 2161.00 | 0 |
1989-11-02 | Packing Device Capped w/Cement | 2144.00 | 2152.00 | 0 |
1989-11-02 | Packing Device Capped w/Cement | 762.00 | 770.00 | 0 |
1989-11-02 | Perforation | 302.00 | 303.00 | 13 |
1989-11-03 | Remedial Casing Cementing | 302.00 | 303.00 | 0 |
1962-03-09 | Acid Treatment | 2158.30 | 2160.10 | 0 |
1962-03-09 | Cement Squeeze | 2158.30 | 2160.10 | 0 |
1962-03-10 | Perforation | 2172.60 | 2176.90 | 7 |
1962-03-10 | Perforation | 2179.30 | 2184.20 | 7 |
1962-03-12 | Acid Treatment | 2172.60 | 2184.20 | 0 |
1962-03-13 | Acid Treatment | 2172.60 | 2184.20 | 0 |
1968-04-05 | Nitrogen Treatment | 2172.60 | 2184.20 | 0 |
1989-10-19 | Cement Squeeze | 2172.60 | 2184.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1408 | 0.0 | 0.0 | 0.0 |
1969 | 8366 | 0.0 | 0.0 | 0.0 |
1970 | 8050 | 0.0 | 0.0 | 0.0 |
1971 | 8480 | 0.0 | 0.0 | 0.0 |
1972 | 7904 | 0.0 | 0.0 | 0.0 |
1973 | 8291 | 0.0 | 0.0 | 0.0 |
1974 | 8158 | 0.0 | 0.0 | 0.0 |
1975 | 8335 | 0.0 | 0.0 | 0.0 |
1976 | 8463 | 0.0 | 0.0 | 0.0 |
1977 | 7479 | 0.0 | 0.0 | 0.0 |
1978 | 1933 | 0.0 | 0.0 | 0.0 |
1979 | 175 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1961-11-28 | Lost Circulation | 1524.00 | 1524.00 |
1961-12-10 | Lost Circulation | 2166.80 | 2166.80 |
For data sources see[6]