X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445052210002

Well Details

Well ID: 0445052210002
Loading map...
Location: 00/10-22-044-05W5/2
Location Alias: 00/10-22-44-05 W5M
Location Alias 2: 00/10-22-044-05 W5/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 05
Section: 22
County/Municipality: Clearwater County
Well Name: TAC ET AL MINHIK 10-22-44-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0076436
License Date: 1979-06-19
License Status: Suspension
Spud Date: 1979-08-08
Final Drill Date: 1979-08-25
Well Total Depth: 2253.00 m
Surface Hole Latitude: 52.810496
Surface Hole Longitude: -114.638333

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-19 Obtained License
1979-08-25 Finished Drilling
1979-08-25 Well Mode changed to Drilled and Cased
1979-08-29 Production Casing Operation Performed
1979-09-13 Perforation Treatment Performed - Jet Perforation
1979-09-14 Perforation Treatment Performed - Acid Wash - No Pressure
1993-09-14 Perforation Treatment Performed - Jet Perforation
1998-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-13 Perforation Treatment Performed - Cement Squeeze
1998-08-13 Plug Back Performed
1998-08-13 Well Log Performed
1998-08-17 Perforation Treatment Performed - Jet Perforation
1998-08-17 Well Log Performed
1998-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-18 Plug Back Performed
1998-08-18 Well Log Performed
1998-08-19 Perforation Treatment Performed - Jet Perforation
1998-08-19 Well Log Performed
1998-08-23 Perforation Treatment Performed - Fractured
1998-09-18 Well Began Production
1998-09-18 Well Fluid changed to Crude Oil
1998-09-18 Well Mode changed to Pumping
1998-09-19 Well Fluid changed to Crude Oil
1998-09-19 Well Mode changed to Pumping
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended
2012-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-24 Well Log Performed
2015-06-16 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-13 Perforation 2185.60 2192.20 7
2012-02-24 Packing Device Capped w/Cement 2126.00 2134.00 0
2015-06-16 Perforation 1935.50 1937.00 17
1979-09-14 Acid Wash 2185.60 2192.20 0
1993-09-14 Perforation 2178.50 2184.50 13
1998-04-07 Acid Treatment 2178.50 2192.20 0
1998-08-13 Cement Squeeze 2178.50 2192.20 0
1998-08-17 Perforation 2165.00 2170.00 17
1998-08-18 Packing Device Capped w/Cement 2156.00 2164.00 0
1998-08-19 Perforation 2143.50 2147.50 17
1998-08-23 Fracture 2143.50 2147.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2211 0.0 0.0 0.0
1999 8689 0.0 0.0 0.0
2000 5533 0.0 0.0 0.0
2001 6032 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References