If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445052516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.811828,"lon":-114.594493,"icon":""}]} |
Location: 00/16-25-044-05W5/0 | |
Location Alias: 00/16-25-44-05 W5M | |
Location Alias 2: 00/16-25-044-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 05 | |
Section: 25 | |
County/Municipality: Clearwater County | |
Well Name: TAC HZ PEMBINA 16-25-44-5 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0444895 | |
License Date: 2012-03-12 | |
License Status: Amended | |
Spud Date: 2012-04-08 | |
Final Drill Date: 2012-04-15 | |
Well Total Depth: 3572.00 m | |
Surface Hole Latitude: 52.811828 | |
Surface Hole Longitude: -114.594493 |
Date | Event |
---|---|
2012-03-12 | Obtained License |
2012-04-09 | Surface Casing Operation Performed |
2012-04-09 | Well Log Performed |
2012-04-10 | Direction Drilling Operation Performed - Deviate |
2012-04-12 | Direction Drilling Operation Performed - Horizontal |
2012-04-12 | Well Log Performed |
2012-04-15 | Finished Drilling |
2012-04-15 | Perforation Treatment Performed - Open-Hole Completion |
2012-04-15 | Well Log Performed |
2012-04-15 | Well Mode changed to Drilled and Cased |
2012-04-16 | Production Casing Operation Performed |
2012-04-17 | Rig Released |
2012-07-15 | Well Log Performed |
2012-07-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-01 | Well Fluid changed to Crude Oil |
2012-08-01 | Well Mode changed to Drilling and Completing |
2012-08-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-01 | Well Began Production |
2012-12-01 | Well Fluid changed to Crude Oil |
2012-12-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-04-08 | Nabors Drilling Limited | 15 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-04-10 | 1033.00 | Deviate (5 - 79 degrees) |
2012-04-12 | 2055.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-04-15 | Open Hole/Barefoot Completion | 3556.60 | 3572.00 | 0 |
2012-08-02 | Multi-Stage Fracture | 2938.30 | 2938.40 | 0 |
2012-08-02 | Multi-Stage Fracture | 2876.20 | 2876.30 | 0 |
2012-08-02 | Multi-Stage Fracture | 2813.70 | 2813.80 | 0 |
2012-08-02 | Multi-Stage Fracture | 2751.90 | 2752.00 | 0 |
2012-08-03 | Multi-Stage Fracture | 2690.50 | 2690.60 | 0 |
2012-08-03 | Multi-Stage Fracture | 2628.60 | 2628.70 | 0 |
2012-08-03 | Multi-Stage Fracture | 2566.00 | 2567.10 | 0 |
2012-08-03 | Multi-Stage Fracture | 2489.90 | 2490.00 | 0 |
2012-08-03 | Multi-Stage Fracture | 2428.30 | 2428.40 | 0 |
2012-08-03 | Multi-Stage Fracture | 2351.50 | 2351.60 | 0 |
2012-07-30 | Multi-Stage Fracture | 3538.80 | 3538.90 | 0 |
2012-08-03 | Multi-Stage Fracture | 2289.50 | 2289.60 | 0 |
2012-07-30 | Multi-Stage Fracture | 3476.00 | 3476.10 | 0 |
2012-08-02 | Multi-Stage Fracture | 3351.40 | 3351.50 | 0 |
2012-08-02 | Multi-Stage Fracture | 3277.20 | 3277.30 | 0 |
2012-08-02 | Multi-Stage Fracture | 3215.80 | 3215.90 | 0 |
2012-08-02 | Multi-Stage Fracture | 3139.20 | 3139.30 | 0 |
2012-08-02 | Multi-Stage Fracture | 3076.90 | 3077.00 | 0 |
2012-08-02 | Multi-Stage Fracture | 3013.80 | 3013.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 380 | 0.0 | 0.0 | 0.0 |
2013 | 8026 | 0.0 | 0.0 | 0.0 |
2014 | 8584 | 0.0 | 0.0 | 0.0 |
2015 | 8673 | 0.0 | 0.0 | 0.0 |
2016 | 7098 | 0.0 | 0.0 | 0.0 |
2017 | 8092 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-17 | No Incident Encountered | 0.00 | 0.00 |
2012-08-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]