X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445053503000

Well Details

Well ID: 0445053503000
Loading map...
Location: 00/03-35-044-05W5/0
Location Alias: 00/03-35-44-05 W5M
Location Alias 2: 00/03-35-044-05 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 05
Section: 35
County/Municipality: Clearwater County
Well Name: TAC HZ PEMBINA 3-35-44-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0437854
License Date: 2011-10-21
License Status: Amended
Spud Date: 2011-11-16
Final Drill Date: 2011-11-23
Well Total Depth: 3010.00 m
Surface Hole Latitude: 52.842141
Surface Hole Longitude: -114.634597

For data sources see[1][2]

Well History

Date Event
2011-10-21 Obtained License
2011-11-02 Surface Casing Operation Performed
2011-11-19 Direction Drilling Operation Performed - Horizontal
2011-11-23 Finished Drilling
2011-11-23 Perforation Treatment Performed - Open-Hole Completion
2011-11-23 Well Log Performed
2011-11-23 Well Mode changed to Drilled and Cased
2011-11-24 Production Casing Operation Performed
2011-11-24 Rig Released
2011-12-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-15 Well Fluid changed to Crude Oil
2011-12-15 Well Mode changed to Drilling and Completing
2012-01-01 Well Began Production
2012-01-01 Well Fluid changed to Crude Oil
2012-01-01 Well Mode changed to Flowing
2012-02-01 Well Fluid changed to Crude Oil
2012-02-01 Well Mode changed to Suspended
2012-12-01 Well Fluid changed to Crude Oil
2012-12-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-19 1135.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-23 Open Hole/Barefoot Completion 2998.40 3010.00 0
2011-12-12 Multi-Stage Fracture 2535.50 2535.60 0
2011-12-12 Multi-Stage Fracture 2484.70 2484.80 0
2011-12-12 Multi-Stage Fracture 2434.00 2434.10 0
2011-12-12 Multi-Stage Fracture 2370.00 2370.10 0
2011-12-12 Multi-Stage Fracture 2319.20 2319.30 0
2011-12-13 Multi-Stage Fracture 2268.90 2269.00 0
2011-12-13 Multi-Stage Fracture 2204.90 2205.00 0
2011-12-13 Multi-Stage Fracture 2154.50 2154.60 0
2011-12-13 Multi-Stage Fracture 2105.20 2105.30 0
2011-12-13 Multi-Stage Fracture 2041.40 2041.50 0
2011-12-12 Multi-Stage Fracture 2979.70 2979.80 0
2011-12-13 Multi-Stage Fracture 1991.60 1991.70 0
2011-12-13 Multi-Stage Fracture 1940.90 1941.00 0
2011-12-12 Multi-Stage Fracture 2929.50 2929.60 0
2011-12-12 Multi-Stage Fracture 2864.80 2864.90 0
2011-12-12 Multi-Stage Fracture 2815.50 2815.60 0
2011-12-12 Multi-Stage Fracture 2750.90 2751.00 0
2011-12-12 Multi-Stage Fracture 2700.90 2701.00 0
2011-12-12 Multi-Stage Fracture 2650.40 2650.50 0
2011-12-12 Multi-Stage Fracture 2585.80 2585.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 0 0.0 0.0 0.0
2012 654 0.0 0.0 0.0
2013 8490 0.0 0.0 0.0
2014 8702 0.0 0.0 0.0
2015 8671 0.0 0.0 0.0
2016 8599 0.0 0.0 0.0
2017 8647 0.0 0.0 0.0
2018 7802 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References