If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445053507000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.842215,"lon":-114.63478,"icon":""}]} |
Location: 00/07-35-044-05W5/0 | |
Location Alias: 00/07-35-44-05 W5M | |
Location Alias 2: 00/07-35-044-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 05 | |
Section: 35 | |
County/Municipality: Clearwater County | |
Well Name: TAC HZ PEMBINA 7-35-44-5 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0437855 | |
License Date: 2011-10-21 | |
License Status: Issued | |
Spud Date: 2011-11-05 | |
Final Drill Date: 2011-11-12 | |
Well Total Depth: 3020.00 m | |
Surface Hole Latitude: 52.842215 | |
Surface Hole Longitude: -114.634780 |
Date | Event |
---|---|
2011-10-21 | Obtained License |
2011-11-01 | Surface Casing Operation Performed |
2011-11-07 | Well Log Performed |
2011-11-08 | Direction Drilling Operation Performed - Horizontal |
2011-11-12 | Finished Drilling |
2011-11-12 | Well Log Performed |
2011-11-12 | Well Mode changed to Drilled and Cased |
2011-11-13 | Well Log Performed |
2011-11-14 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-14 | Production Casing Operation Performed |
2011-11-14 | Rig Released |
2011-12-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-12-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-01 | Well Fluid changed to Crude Oil |
2012-01-01 | Well Mode changed to Drilling and Completing |
2012-09-01 | Well Began Production |
2012-09-01 | Well Fluid changed to Crude Oil |
2012-09-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-08 | 1115.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-14 | Open Hole/Barefoot Completion | 3012.00 | 3020.00 | 0 |
2011-12-11 | Multi-Stage Fracture | 2551.60 | 2551.70 | 0 |
2011-12-11 | Multi-Stage Fracture | 2501.00 | 2502.90 | 0 |
2011-12-11 | Multi-Stage Fracture | 2450.10 | 2450.20 | 0 |
2011-12-11 | Multi-Stage Fracture | 2385.40 | 2385.50 | 0 |
2011-12-11 | Multi-Stage Fracture | 2335.30 | 2335.40 | 0 |
2011-12-11 | Multi-Stage Fracture | 2284.70 | 2284.80 | 0 |
2011-12-11 | Multi-Stage Fracture | 2219.50 | 2219.60 | 0 |
2011-12-11 | Multi-Stage Fracture | 2154.70 | 2154.80 | 0 |
2011-12-11 | Multi-Stage Fracture | 2089.30 | 2089.40 | 0 |
2011-12-11 | Multi-Stage Fracture | 2023.90 | 2024.00 | 0 |
2011-12-10 | Multi-Stage Fracture | 2994.30 | 2994.40 | 0 |
2011-12-11 | Multi-Stage Fracture | 1960.60 | 1960.70 | 0 |
2011-12-11 | Multi-Stage Fracture | 1895.90 | 1896.00 | 0 |
2011-12-10 | Multi-Stage Fracture | 2943.90 | 2944.00 | 0 |
2011-12-10 | Multi-Stage Fracture | 2880.40 | 2880.50 | 0 |
2011-12-10 | Multi-Stage Fracture | 2832.00 | 2833.90 | 0 |
2011-12-10 | Multi-Stage Fracture | 2767.70 | 2767.80 | 0 |
2011-12-10 | Multi-Stage Fracture | 2717.10 | 2717.20 | 0 |
2011-12-11 | Multi-Stage Fracture | 2666.60 | 2666.70 | 0 |
2011-12-11 | Multi-Stage Fracture | 2602.10 | 2602.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 651 | 0.0 | 0.0 | 0.0 |
2013 | 8451 | 0.0 | 0.0 | 0.0 |
2014 | 8511 | 0.0 | 0.0 | 0.0 |
2015 | 8283 | 0.0 | 0.0 | 0.0 |
2016 | 8599 | 0.0 | 0.0 | 0.0 |
2017 | 8647 | 0.0 | 0.0 | 0.0 |
2018 | 8741 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[6]