X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445063413020

Well Details

Well ID: 0445063413020
Loading map...
Location: 02/13-34-044-06W5/0
Location Alias: 02/13-34-44-06 W5M
Location Alias 2: 02/13-34-044-06 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 06
Section: 34
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC 1-2 HZ 102 PEMBINA 13-34-44-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0493076
License Date: 2019-01-07
License Status: Issued
Spud Date: 2019-06-13
Final Drill Date: 2019-06-22
Well Total Depth: 4584.00 m
Surface Hole Latitude: 52.846085
Surface Hole Longitude: -114.756176

For data sources see[1][2]

Well History

Date Event
2019-01-07 Obtained License
2019-06-13 Drill To LD
2019-06-13 Surface Casing Operation Performed
2019-06-15 Direction Drilling Operation Performed - Deviate
2019-06-17 Direction Drilling Operation Performed - Horizontal
2019-06-22 Finished Drilling
2019-06-22 Well Mode changed to Drilled and Cased
2019-06-23 Production Casing Operation Performed
2019-06-23 Well Log Performed
2019-06-24 Rig Released
2019-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-08-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-08-11 Well Began Production
2019-08-11 Well Fluid changed to Crude Oil
2019-08-11 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-06-13 Precision Drilling Corporation 309 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-06-15 768.60 Deviate (5 - 79 degrees)
2019-06-17 1800.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-08-02 Multi-Stage Fracture 4525.10 4525.20 0
2019-08-02 Multi-Stage Fracture 4173.80 4173.90 0
2019-08-02 Multi-Stage Fracture 4125.90 4126.00 0
2019-08-02 Multi-Stage Fracture 4092.30 4092.40 0
2019-08-02 Multi-Stage Fracture 4044.20 4044.30 0
2019-08-02 Multi-Stage Fracture 4010.60 4010.70 0
2019-08-02 Multi-Stage Fracture 3963.20 3963.30 0
2019-08-02 Multi-Stage Fracture 3929.60 3929.70 0
2019-08-02 Multi-Stage Fracture 3884.30 3884.40 0
2019-08-02 Multi-Stage Fracture 3851.20 3851.30 0
2019-08-02 Multi-Stage Fracture 3804.50 3804.60 0
2019-08-02 Multi-Stage Fracture 4480.20 4480.30 0
2019-08-02 Multi-Stage Fracture 3771.60 3771.70 0
2019-08-02 Multi-Stage Fracture 3723.50 3723.60 0
2019-08-02 Multi-Stage Fracture 3690.70 3690.80 0
2019-08-02 Multi-Stage Fracture 3643.10 3643.20 0
2019-08-02 Multi-Stage Fracture 3609.70 3609.80 0
2019-08-02 Multi-Stage Fracture 3561.60 3561.70 0
2019-08-02 Multi-Stage Fracture 3528.60 3528.70 0
2019-08-02 Multi-Stage Fracture 3480.60 3480.70 0
2019-08-02 Multi-Stage Fracture 3448.20 3448.30 0
2019-08-02 Multi-Stage Fracture 3400.60 3400.70 0
2019-08-02 Multi-Stage Fracture 4446.50 4446.60 0
2019-08-02 Multi-Stage Fracture 3367.20 3367.30 0
2019-08-02 Multi-Stage Fracture 3320.30 3320.40 0
2019-08-02 Multi-Stage Fracture 3214.70 3214.80 0
2019-08-02 Multi-Stage Fracture 3167.50 3167.60 0
2019-08-02 Multi-Stage Fracture 3134.20 3134.30 0
2019-08-02 Multi-Stage Fracture 3086.40 3086.50 0
2019-08-02 Multi-Stage Fracture 3052.70 3052.80 0
2019-08-02 Multi-Stage Fracture 3005.20 3005.30 0
2019-08-02 Multi-Stage Fracture 2971.60 2971.70 0
2019-08-02 Multi-Stage Fracture 2923.80 2923.90 0
2019-08-02 Multi-Stage Fracture 4415.20 4415.30 0
2019-08-02 Multi-Stage Fracture 2890.30 2890.40 0
2019-08-02 Multi-Stage Fracture 2842.20 2842.30 0
2019-08-02 Multi-Stage Fracture 2808.70 2808.80 0
2019-08-02 Multi-Stage Fracture 2761.10 2761.20 0
2019-08-03 Multi-Stage Fracture 2727.60 2727.70 0
2019-08-03 Multi-Stage Fracture 2680.40 2680.50 0
2019-08-03 Multi-Stage Fracture 2646.80 2646.90 0
2019-08-03 Multi-Stage Fracture 2598.70 2598.80 0
2019-08-03 Multi-Stage Fracture 2565.50 2565.60 0
2019-08-03 Multi-Stage Fracture 2517.50 2517.60 0
2019-08-02 Multi-Stage Fracture 4369.30 4369.40 0
2019-08-03 Multi-Stage Fracture 2483.80 2483.90 0
2019-08-03 Multi-Stage Fracture 2436.10 2436.20 0
2019-08-03 Multi-Stage Fracture 2403.10 2403.20 0
2019-08-03 Multi-Stage Fracture 2355.00 2355.10 0
2019-08-03 Multi-Stage Fracture 2321.60 2321.70 0
2019-08-03 Multi-Stage Fracture 2274.40 2274.50 0
2019-08-03 Multi-Stage Fracture 2226.50 2226.60 0
2019-08-02 Multi-Stage Fracture 4335.90 4336.00 0
2019-08-02 Multi-Stage Fracture 4288.50 4288.60 0
2019-08-02 Multi-Stage Fracture 4255.50 4255.60 0
2019-08-02 Multi-Stage Fracture 4207.40 4207.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-02 2019-08-03 1,724 5,770 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 93.1671 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 6.4895 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 0.3432 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0096 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0096 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.071 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.071 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0452 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0452 N/A
ELEFE-4 IFTR Element Surfactant Alkylbenzenesulfonic acid Trade Secret 100 0.0879 N/A
Ethylene Glycol 107-21-1 100 0.0879 N/A
Isopropanol 67-63-0 100 0.0879 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0879 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-07-29 2019-08-03 Surface Water - Runoff 5771

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3204 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-24 No Incident Encountered 0.00 0.00
2019-08-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References