X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445090803020

Well Details

Well ID: 0445090803020
Loading map...
Location: 02/03-08-044-09W5/0
Location Alias: 02/03-08-44-09 W5M
Location Alias 2: 02/03-08-044-09 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 09
Section: 08
County/Municipality: Clearwater County
Well Name: WESTBRICK 102 HZ WILLGR 3-8-44-9
Operator Name: Westbrick Energy Ltd.
License Number: 0479984
License Date: 2016-07-27
License Status: Amended
Spud Date: 2016-10-07
Final Drill Date: 2016-10-21
Well Total Depth: 5211.00 m
Surface Hole Latitude: 52.798890
Surface Hole Longitude: -115.271069

For data sources see[1][2]

Well History

Date Event
2016-07-27 Obtained License
2016-10-09 Surface Casing Operation Performed
2016-10-13 Direction Drilling Operation Performed - Deviate
2016-10-13 Direction Drilling Operation Performed - Horizontal
2016-10-13 Well Log Performed
2016-10-14 Intermediate Casing Operation Performed
2016-10-21 Finished Drilling
2016-10-21 Well Log Performed
2016-10-21 Well Mode changed to Drilled and Cased
2016-10-24 Liner Casing Operation Performed
2016-10-24 Perforation Treatment Performed - Open-Hole Completion
2016-10-24 Rig Released
2016-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-01 Well Began Production
2016-12-01 Well Fluid changed to Gas
2016-12-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-10-07 Savanna Drilling Corp. 653 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-10-13 2105.80 Deviate (5 - 79 degrees)
2016-10-13 2509.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-24 Open Hole/Barefoot Completion 5206.00 5211.00 0
2016-11-19 Multi-Stage Fracture 4511.30 4511.50 0
2016-11-19 Multi-Stage Fracture 4415.90 4416.10 0
2016-11-19 Multi-Stage Fracture 4334.00 4334.20 0
2016-11-19 Multi-Stage Fracture 4251.90 4252.10 0
2016-11-19 Multi-Stage Fracture 4169.80 4170.00 0
2016-11-19 Multi-Stage Fracture 4087.70 4087.90 0
2016-11-19 Multi-Stage Fracture 4005.70 4005.90 0
2016-11-19 Multi-Stage Fracture 3923.60 3923.80 0
2016-11-19 Multi-Stage Fracture 3841.50 3841.70 0
2016-11-19 Multi-Stage Fracture 3760.40 3760.60 0
2016-11-19 Multi-Stage Fracture 5170.40 5170.60 0
2016-11-19 Multi-Stage Fracture 3678.90 3679.10 0
2016-11-19 Multi-Stage Fracture 3596.80 3597.00 0
2016-11-19 Multi-Stage Fracture 3514.90 3515.10 0
2016-11-19 Multi-Stage Fracture 3419.40 3419.60 0
2016-11-19 Multi-Stage Fracture 3340.00 3340.20 0
2016-11-19 Multi-Stage Fracture 3261.50 3261.70 0
2016-11-19 Multi-Stage Fracture 3181.10 3181.30 0
2016-11-19 Multi-Stage Fracture 3088.80 3089.00 0
2016-11-19 Multi-Stage Fracture 3008.40 3008.60 0
2016-11-19 Multi-Stage Fracture 2929.40 2929.60 0
2016-11-19 Multi-Stage Fracture 5083.20 5083.40 0
2016-11-19 Multi-Stage Fracture 2849.00 2849.20 0
2016-11-19 Multi-Stage Fracture 2757.50 2757.70 0
2016-11-19 Multi-Stage Fracture 2678.20 2678.40 0
2016-11-19 Multi-Stage Fracture 2597.40 2597.60 0
2016-11-19 Multi-Stage Fracture 4998.50 4998.70 0
2016-11-19 Multi-Stage Fracture 4915.90 4916.10 0
2016-11-19 Multi-Stage Fracture 4830.60 4830.80 0
2016-11-19 Multi-Stage Fracture 4758.80 4759.00 0
2016-11-19 Multi-Stage Fracture 4675.60 4675.80 0
2016-11-19 Multi-Stage Fracture 4593.50 4593.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-19 2016-11-19 2,400 8,588 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 87.0098 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 3.1853 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 7.8899 N/A
SBExcel 20/40 Trican silica crystalline 14808-60-7 100 1.6413 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0103 N/A
2-mercaptoethanol 60-24-2 100 0.0103 N/A
dibromoacetonitrile 3252-43-5 100 0.0103 N/A
non-hazardous ingredients Not Available 100 0.0103 N/A
sodium bromide 7647-15-6 100 0.0103 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0086 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1627 N/A
non-hazardous ingredients Not Available 100 0.1627 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0442 N/A
propylene glycol 57-55-6 100 0.0442 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0303 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0171 N/A
non-hazardous ingredients Not Available 100 0.0171 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-09-28 2016-11-13 Surface Water - Lake 3611
2016-09-28 2016-11-13 Surface Water - Lake 4978

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 412 0.0 0.0 0.0
2017 7055 0.0 0.0 0.0
2018 7727 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-24 No Incident Encountered 0.00 0.00
2016-11-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References