X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445112616020

Well Details

Well ID: 0445112616020
Loading map...
Location: 02/16-26-044-11W5/0
Location Alias: 02/16-26-44-11 W5M
Location Alias 2: 02/16-26-044-11 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 11
Section: 26
County/Municipality: Clearwater County
Well Name: WESTBRICK 102 HZ PEMBINA 16-26-44-11
Operator Name: Westbrick Energy Ltd.
License Number: 0490018
License Date: 2018-07-16
License Status: Amended
Spud Date: 2018-07-28
Final Drill Date: 2018-08-08
Well Total Depth: 5454.00 m
Surface Hole Latitude: 52.823761
Surface Hole Longitude: -115.521812

For data sources see[1][2]

Well History

Date Event
2018-07-16 Obtained License
2018-07-29 Surface Casing Operation Performed
2018-08-01 Intermediate Casing Operation Performed
2018-08-03 Direction Drilling Operation Performed - Deviate
2018-08-03 Well Log Performed
2018-08-04 Well Log Performed
2018-08-05 Direction Drilling Operation Performed - Horizontal
2018-08-08 Finished Drilling
2018-08-08 Well Log Performed
2018-08-08 Well Mode changed to Drilled and Cased
2018-08-10 Perforation Treatment Performed - Open-Hole Completion
2018-08-10 Production Casing Operation Performed
2018-08-11 Rig Released
2018-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-01 Well Began Production
2018-11-01 Well Fluid changed to Gas
2018-11-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-28 Savanna Drilling Corp. 653 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-03 2295.10 Deviate (5 - 79 degrees)
2018-08-05 2698.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-10 Open Hole/Barefoot Completion 5448.00 5454.00 0
2018-10-10 Multi-Stage Fracture 4854.20 4855.30 0
2018-10-10 Multi-Stage Fracture 4732.60 4733.60 0
2018-10-10 Multi-Stage Fracture 4664.40 4665.50 0
2018-10-10 Multi-Stage Fracture 4583.40 4584.50 0
2018-10-10 Multi-Stage Fracture 4504.80 4505.90 0
2018-10-10 Multi-Stage Fracture 4411.40 4412.50 0
2018-10-10 Multi-Stage Fracture 4335.40 4336.40 0
2018-10-10 Multi-Stage Fracture 4256.00 4257.10 0
2018-10-10 Multi-Stage Fracture 4173.70 4174.80 0
2018-10-11 Multi-Stage Fracture 4091.60 4092.60 0
2018-10-10 Multi-Stage Fracture 5440.30 5441.20 0
2018-10-11 Multi-Stage Fracture 4016.00 4017.00 0
2018-10-11 Multi-Stage Fracture 3936.10 3937.10 0
2018-10-11 Multi-Stage Fracture 3855.80 3856.90 0
2018-10-11 Multi-Stage Fracture 3773.60 3774.70 0
2018-10-11 Multi-Stage Fracture 3691.30 3692.40 0
2018-10-11 Multi-Stage Fracture 3636.10 3637.20 0
2018-10-11 Multi-Stage Fracture 3472.60 3473.60 0
2018-10-11 Multi-Stage Fracture 3403.80 3404.80 0
2018-10-11 Multi-Stage Fracture 3321.40 3322.50 0
2018-10-11 Multi-Stage Fracture 3239.10 3240.20 0
2018-10-10 Multi-Stage Fracture 5358.70 5359.60 0
2018-10-11 Multi-Stage Fracture 3157.10 3158.20 0
2018-10-11 Multi-Stage Fracture 3115.40 3116.50 0
2018-10-11 Multi-Stage Fracture 3033.00 3034.10 0
2018-10-11 Multi-Stage Fracture 2950.70 2951.80 0
2018-10-11 Multi-Stage Fracture 2832.00 2833.10 0
2018-10-11 Multi-Stage Fracture 2763.50 2764.60 0
2018-10-10 Multi-Stage Fracture 5276.60 5277.50 0
2018-10-10 Multi-Stage Fracture 5195.80 5196.70 0
2018-10-10 Multi-Stage Fracture 5115.00 5115.90 0
2018-10-10 Multi-Stage Fracture 5032.80 5033.70 0
2018-10-10 Multi-Stage Fracture 4950.90 4951.80 0
2018-10-10 Multi-Stage Fracture 4882.30 4883.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-10 2018-10-11 2,568 8,215 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.3701 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.3767 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 8.9712 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0223 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0224 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0223 N/A
Polyethylene glycol 25322-68-3 100 0.0223 N/A
Sodium bromide 7647-15-6 100 0.0223 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.075 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0913 N/A
DAP-902 Calfrac Scale Inhibitor Non-Hazardous Ingredients Trade Secret 100 0.0154 N/A
CalSurf 9400 Calfrac Surfactant Ethoxylated Alcohols Trade Secret 100 0.0776 N/A
Methanol 67-56-1 100 0.0776 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0776 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-09-07 2018-10-13 Surface Water - River 14215

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1320 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-11 No Incident Encountered 0.00 0.00
2018-10-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References