If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454061502D00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.87531,"lon":-110.785471,"icon":""}]} |
Location: D0/02-15-045-06W4/0 | |
Location Alias: D0/02-15-45-06 W4M | |
Location Alias 2: D0/02-15-045-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 06 | |
Section: 15 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: CONCHO WAINWRIGHT 2D-15-45-6 | |
Operator Name: Canadian Reserve Oil And Gas Ltd. | |
License Number: 0013746 | |
License Date: 1957-07-31 | |
License Status: RecExempt | |
Spud Date: 1957-08-02 | |
Final Drill Date: 1957-08-08 | |
Well Total Depth: 675.10 m | |
Surface Hole Latitude: 52.875310 | |
Surface Hole Longitude: -110.785471 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1957-07-31 | Obtained License |
1957-08-08 | Finished Drilling |
1957-08-08 | Well Mode changed to Drilled and Cased |
1957-08-10 | Drill Stem Test Performed |
1957-08-11 | Production Casing Operation Performed |
1957-12-01 | Perforation Treatment Performed - Bullet Perforation |
1957-12-07 | Well Began Production |
1957-12-07 | Well Fluid changed to Crude Oil |
1957-12-07 | Well Mode changed to Pumping |
1959-09-02 | Perforation Treatment Performed - Fractured |
1962-06-29 | Well Abandoned |
1962-06-29 | Well Fluid changed to Crude Oil |
1962-06-29 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-12-01 | Bullet Perforation | 657.10 | 658.40 | 20 |
1959-09-02 | Fracture | 657.10 | 658.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]