X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454121906000

Well Details

Well ID: 0454121906000
Loading map...
Location: 00/06-19-045-12W4/0
Location Alias: 00/06-19-45-12 W4M
Location Alias 2: 00/06-19-045-12 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 12
Section: 19
County/Municipality: Flagstaff County
Well Name: PINE CLIFF KILLAMN 6-19-45-12
Operator Name: Pine Cliff Energy Ltd.
License Number: 0059696
License Date: 1976-08-11
License Status: Abandoned
Spud Date: 1976-08-14
Final Drill Date: 1976-08-17
Well Total Depth: 876.30 m
Surface Hole Latitude: 52.891543
Surface Hole Longitude: -111.737999

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-11 Obtained License
1976-08-17 Finished Drilling
1976-08-17 Well Mode changed to Drilled and Cased
1976-08-18 Production Casing Operation Performed
1976-08-30 Perforation Treatment Performed - Jet Perforation
1976-11-01 Well Began Production
1976-11-01 Well Fluid changed to Gas
1976-11-01 Well Mode changed to Flowing
1982-09-26 Perforation Treatment Performed - Cement Squeeze
1982-09-26 Perforation Treatment Performed - Selective Jet Perforations
1983-03-01 Well Fluid changed to Gas
1983-03-01 Well Mode changed to Suspended
1983-11-01 Well Fluid changed to Gas
1983-11-01 Well Mode changed to Flowing
2009-01-01 Well Fluid changed to Gas
2009-01-01 Well Mode changed to Suspended
2010-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-08 Plug Back Performed
2010-08-08 Well Fluid changed to Gas
2010-08-08 Well Mode changed to Abandoned Zone
2010-08-09 Well Log Performed
2010-08-11 Well Abandoned
2010-08-11 Well Fluid changed to Coalbed Methane-Coals and Other
2010-08-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-30 Perforation 693.10 695.20 10
1982-09-26 Selective Jet Perforations 375.00 375.00 0
1982-09-26 Cement Squeeze 375.00 375.00 0
2010-08-08 Packing Device Capped w/Cement 677.00 685.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1027 0.0 0.0 0.0
1977 5166 0.0 0.0 0.0
1978 5655 0.0 0.0 0.0
1979 8541 0.0 0.0 0.0
1980 4566 0.0 0.0 0.0
1981 3903 0.0 0.0 0.0
1982 3753 0.0 0.0 0.0
1983 1655 0.0 0.0 0.0
1984 5236 0.0 0.0 0.0
1985 5895 0.0 0.0 0.0
1986 7502 0.0 0.0 0.0
1987 2494 0.0 0.0 0.0
1988 3825 0.0 0.0 0.0
1989 4491 0.0 0.0 0.0
1990 3015 0.0 0.0 0.0
1991 4752 0.0 0.0 0.0
1992 8120 0.0 0.0 0.0
1993 8737 0.0 0.0 0.0
1994 6203 0.0 0.0 0.0
1995 7910 0.0 0.0 0.0
1996 8615 0.0 0.0 0.0
1997 8749 0.0 0.0 0.0
1998 8429 0.0 0.0 0.0
1999 7965 0.0 0.0 0.0
2000 8683 0.0 0.0 0.0
2001 8506 0.0 0.0 0.0
2002 8217 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8644 0.0 0.0 0.0
2005 8711 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 5831 0.0 0.0 0.0
2008 721 0.0 0.0 0.0

For data sources see[5]

References