X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454122206000

Well Details

Well ID: 0454122206000
Loading map...
Location: 00/06-22-045-12W4/0
Location Alias: 00/06-22-45-12 W4M
Location Alias 2: 00/06-22-045-12 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 12
Section: 22
County/Municipality: Flagstaff County
Well Name: PINE CLIFF KILLAMN 6-22-45-12
Operator Name: Pine Cliff Energy Ltd.
License Number: 0094885
License Date: 1982-02-03
License Status: Issued
Spud Date: 1982-02-10
Final Drill Date: 1982-02-14
Well Total Depth: 919.00 m
Surface Hole Latitude: 52.893666
Surface Hole Longitude: -111.661596

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-02-03 Obtained License
1982-02-13 Drill Stem Test Performed
1982-02-14 Finished Drilling
1982-02-15 Drill Stem Test Performed
1982-02-16 Production Casing Operation Performed
1982-02-16 Well Mode changed to Drilled and Cased
1982-06-22 Perforation Treatment Performed - Jet Perforation
1982-12-01 Well Began Production
1982-12-01 Well Fluid changed to Gas
1982-12-01 Well Mode changed to Flowing
1983-07-01 Well Fluid changed to Gas
1983-07-01 Well Mode changed to Suspended
1983-11-01 Well Fluid changed to Gas
1983-11-01 Well Mode changed to Flowing
1999-03-01 Well Fluid changed to Gas
1999-03-01 Well Mode changed to Suspended
2001-03-01 Well Fluid changed to Gas
2001-03-01 Well Mode changed to Flowing
2003-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-25 Perforation Treatment Performed - Jet Perforation
2003-06-25 Plug Back Performed
2003-06-25 Well Fluid changed to Gas
2003-06-25 Well Log Performed
2003-06-25 Well Mode changed to Abandoned Zone
2003-06-26 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-06-22 Perforation 826.00 828.50 13
2003-06-25 Packing Device Capped w/Cement 812.00 820.00 0
2003-06-25 Perforation 719.00 722.00 20
2003-06-26 Fracture 719.00 722.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 744 0.0 0.0 0.0
1983 4155 0.0 0.0 0.0
1984 7357 0.0 0.0 0.0
1985 5710 0.0 0.0 0.0
1986 7591 0.0 0.0 0.0
1987 2012 0.0 0.0 0.0
1988 2719 0.0 0.0 0.0
1989 2712 0.0 0.0 0.0
1990 2303 0.0 0.0 0.0
1991 5302 0.0 0.0 0.0
1992 7649 0.0 0.0 0.0
1993 8626 0.0 0.0 0.0
1994 8694 0.0 0.0 0.0
1995 7269 0.0 0.0 0.0
1996 3672 0.0 0.0 0.0
1997 955 0.0 0.0 0.0
1998 12 0.0 0.0 0.0
2001 5796 0.0 0.0 0.0
2002 6042 0.0 0.0 0.0

For data sources see[5]

References