If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454143006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.906147,"lon":-112.028943,"icon":""}]} |
Location: 00/06-30-045-14W4/0 | |
Location Alias: 00/06-30-45-14 W4M | |
Location Alias 2: 00/06-30-045-14 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 14 | |
Section: 30 | |
County/Municipality: Flagstaff County | |
Well Name: PINE CLIFF KILLAMN 6-30-45-14 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0077609 | |
License Date: 1979-08-21 | |
License Status: Suspension | |
Spud Date: 1979-08-23 | |
Final Drill Date: 1979-08-27 | |
Well Total Depth: 974.00 m | |
Surface Hole Latitude: 52.906147 | |
Surface Hole Longitude: -112.028943 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-08-21 | Obtained License |
1979-08-26 | Drill Stem Test Performed |
1979-08-27 | Finished Drilling |
1979-08-27 | Well Mode changed to Drilled and Cased |
1979-08-28 | Drill Stem Test Performed |
1979-08-29 | Production Casing Operation Performed |
1979-10-24 | Perforation Treatment Performed - Jet Perforation |
1979-12-01 | Well Began Production |
1979-12-01 | Well Fluid changed to Gas |
1979-12-01 | Well Mode changed to Flowing |
1981-12-01 | Well Fluid changed to Gas |
1981-12-01 | Well Mode changed to Suspended |
1987-03-25 | Well Fluid changed to Gas |
1987-03-25 | Well Mode changed to Flowing |
1989-09-04 | Well Fluid changed to Gas |
1989-09-04 | Well Mode changed to Suspended |
1990-01-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-01-25 | Perforation Treatment Performed - Jet Perforation |
1990-01-25 | Plug Back Performed |
1990-01-25 | Well Fluid changed to Gas |
1990-01-25 | Well Log Performed |
1990-01-25 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-10-24 | Perforation | 929.00 | 930.00 | 7 |
1979-10-24 | Perforation | 934.00 | 935.50 | 7 |
1990-01-25 | Packing Device Capped w/Cement | 917.00 | 925.00 | 0 |
1990-01-25 | Perforation | 758.00 | 761.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 304 | 0.0 | 0.0 | 0.0 |
1980 | 4280 | 0.0 | 0.0 | 0.0 |
1981 | 5212 | 0.0 | 0.0 | 0.0 |
1987 | 1650 | 0.0 | 0.0 | 0.0 |
1988 | 316 | 0.0 | 0.0 | 0.0 |
For data sources see[5]