If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454212003000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.888852,"lon":-113.019401,"icon":""}]} |
Location: 00/03-20-045-21W4/0 | |
Location Alias: 00/03-20-45-21 W4M | |
Location Alias 2: 00/03-20-045-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 21 | |
Section: 20 | |
County/Municipality: Camrose County | |
Well Name: MOBIL DUHAMEL IN 3-20-45-21 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0003932 | |
License Date: 1951-12-12 | |
License Status: Abandoned | |
Spud Date: 1952-01-13 | |
Final Drill Date: 1952-02-02 | |
Well Total Depth: 1486.80 m | |
Surface Hole Latitude: 52.888852 | |
Surface Hole Longitude: -113.019401 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-12-12 | Obtained License |
1952-01-25 | Drill Stem Test Performed |
1952-02-02 | Finished Drilling |
1952-02-02 | Well Mode changed to Drilled and Cased |
1952-02-04 | Production Casing Operation Performed |
1952-02-06 | Perforation Treatment Performed - Bullet Perforation |
1952-02-10 | Well Began Production |
1952-02-10 | Well Fluid changed to Crude Oil |
1952-02-10 | Well Mode changed to Flowing |
1952-03-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1952-04-08 | Perforation Treatment Performed - Jet Perforation |
1952-04-10 | Perforation Treatment Performed - Cement Squeeze |
1952-04-14 | Perforation Treatment Performed - Jet Perforation |
1953-04-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-10-18 | Perforation Treatment Performed - Jet Perforation |
1956-10-25 | Perforation Treatment Performed - Cement Squeeze |
1956-10-26 | Perforation Treatment Performed - Bullet Perforation |
1957-01-29 | Well Fluid changed to Crude Oil |
1957-01-29 | Well Mode changed to Suspended |
1957-07-23 | Well Began Injection |
1957-07-23 | Well Fluid changed to Water |
1957-07-23 | Well Type changed to Disposal |
1958-01-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-06-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-02-10 | Well Fluid changed to Water |
1969-02-10 | Well Mode changed to Suspended |
1969-02-10 | Well Type changed to Disposal |
1969-06-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1969-06-29 | Well Abandoned |
1969-06-29 | Well Fluid changed to Water |
1969-06-29 | Well Mode changed to Abandoned |
1969-06-29 | Well Type changed to Disposal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-02-06 | Bullet Perforation | 1363.40 | 1370.10 | 20 |
1958-01-22 | Acid Treatment | 1387.80 | 1390.80 | 0 |
1959-06-04 | Acid Treatment | 1387.80 | 1390.80 | 0 |
1960-08-22 | Acid Treatment | 1387.80 | 1390.80 | 0 |
1969-06-27 | Packing Device Capped w/Cement | 1341.40 | 1341.40 | 0 |
1952-03-28 | Acid Treatment | 1363.40 | 1367.00 | 0 |
1952-04-08 | Perforation | 1367.30 | 1369.20 | 13 |
1952-04-10 | Cement Squeeze | 1367.30 | 1369.20 | 0 |
1952-04-14 | Perforation | 1367.30 | 1369.20 | 13 |
1953-04-18 | Acid Treatment | 1367.30 | 1369.20 | 0 |
1956-10-18 | Perforation | 1371.00 | 1372.50 | 13 |
1956-10-25 | Cement Squeeze | 1371.00 | 1372.50 | 0 |
1956-10-26 | Bullet Perforation | 1387.80 | 1390.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]