X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454262311002

Well Details

Well ID: 0454262311002
Loading map...
Location: 00/11-23-045-26W4/2
Location Alias: 00/11-23-45-26 W4M
Location Alias 2: 00/11-23-045-26 W4/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 26
Section: 23
County/Municipality: County of Wetaskiwin No. 10
Well Name: EMERALD BAY FBANK 11-23-45-26
Operator Name: Emerald Bay Energy Inc.
License Number: 0078343
License Date: 1979-09-28
License Status: RecCertified
Spud Date: 1979-10-12
Final Drill Date: 1979-10-26
Well Total Depth: 1600.00 m
Surface Hole Latitude: 52.897039
Surface Hole Longitude: -113.674157

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-28 Obtained License
1979-10-23 Drill Stem Test Performed
1979-10-26 Finished Drilling
1979-10-26 Well Log Performed
1979-10-26 Well Mode changed to Drilled and Cased
1979-10-29 Drill Stem Test Performed
1979-11-05 Drill Stem Test Performed
1979-11-07 Drill Stem Test Performed
1979-11-09 Production Casing Operation Performed
1979-12-06 Perforation Treatment Performed - Jet Perforation
1979-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-10 Perforation Treatment Performed - Fractured
1980-01-26 Perforation Treatment Performed - Jet Perforation
1980-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-03 Perforation Treatment Performed - Jet Perforation
1980-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-14 Well Began Production
1980-02-14 Well Fluid changed to Gas
1980-02-14 Well Mode changed to Flowing
1980-07-31 Well Fluid changed to Gas
1980-07-31 Well Mode changed to Suspended
2008-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-03 Plug Back Performed
2008-11-04 Perforation Treatment Performed - Jet Perforation
2008-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-05 Perforation Treatment Performed - Bridge Plug No Cement Required
2008-11-05 Plug Back Performed
2008-11-13 Perforation Treatment Performed - Jet Perforation
2008-11-14 Perforation Treatment Performed - Jet Perforation
2008-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-16 Plug Back Performed
2008-11-16 Well Fluid changed to Gas
2008-11-16 Well Mode changed to Abandoned Zone
2008-11-17 Perforation Treatment Performed - Bridge Plug No Cement Required
2008-11-18 Perforation Treatment Performed - Jet Perforation
2015-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-26 Plug Back Performed
2015-08-26 Well Log Performed
2015-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-27 Plug Back Performed
2015-08-27 Well Log Performed
2015-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-28 Perforation Treatment Performed - Jet Perforation
2015-08-28 Plug Back Performed
2015-08-28 Well Log Performed
2015-08-29 Perforation Treatment Performed - Jet Perforation
2015-08-29 Well Log Performed
2015-08-30 Perforation Treatment Performed - Cement Squeeze
2015-08-30 Plug Back Performed
2015-10-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-06 Perforation 1465.50 1467.00 3
1980-02-03 Perforation 1529.50 1531.50 7
1980-02-06 Acid Treatment 1527.50 1581.50 0
2008-11-03 Packing Device Capped w/Cement 1561.80 1570.30 0
2008-11-04 Perforation 1538.00 1539.90 17
2008-11-05 Bridge Plug, No Cement 1535.80 1536.30 0
2008-11-05 Packing Device Capped w/Cement 1511.80 1520.30 0
2008-11-13 Perforation 1529.50 1531.50 17
2008-11-13 Perforation 1527.50 1528.50 17
2008-11-13 Perforation 1523.30 1526.30 17
2008-11-14 Perforation 1523.30 1526.30 17
1979-12-06 Perforation 1473.00 1475.00 3
2008-11-16 Packing Device Capped w/Cement 1509.00 1517.00 0
2008-11-17 Bridge Plug, No Cement 1459.80 1560.30 0
2008-11-18 Perforation 1368.50 1370.50 17
2008-11-18 Perforation 1318.00 1323.00 17
2015-08-26 Packing Device Capped w/Cement 1452.00 1460.00 0
2015-08-27 Packing Device Capped w/Cement 1352.00 1360.00 0
2015-08-27 Packing Device Capped w/Cement 1302.00 1310.00 0
2015-08-28 Perforation 769.00 771.00 13
2015-08-28 Packing Device Capped w/Cement 755.00 763.00 0
2015-08-28 Perforation 550.00 552.00 13
1979-12-06 Perforation 1479.80 1480.80 3
2015-08-28 Packing Device Capped w/Cement 534.00 542.00 0
2015-08-28 Perforation 474.00 476.00 13
2015-08-29 Perforation 438.00 440.00 13
2015-08-30 Cement Squeeze 474.00 476.00 0
2015-08-30 Cement Squeeze 438.00 440.00 0
1979-12-06 Perforation 1486.00 1487.50 3
1979-12-07 Acid Treatment 1465.50 1487.50 0
1979-12-10 Fracture 1465.50 1487.50 0
1980-01-26 Perforation 1579.50 1581.50 7
1980-02-01 Acid Treatment 1579.50 1581.50 0
1980-02-03 Perforation 1527.50 1528.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2862 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-31 No Incident Encountered 0.00 0.00

For data sources see[6]

References