X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454263205002

Well Details

Well ID: 0454263205002
Loading map...
Location: 00/05-32-045-26W4/2
Location Alias: 00/05-32-45-26 W4M
Location Alias 2: 00/05-32-045-26 W4/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 26
Section: 32
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRES FERRYBANK 5-32-45-26
Operator Name: Canadian Natural Resources Limited
License Number: 0257667
License Date: 2001-07-19
License Status: Issued
Spud Date: 2001-08-03
Final Drill Date: 2001-08-09
Well Total Depth: 1615.00 m
Surface Hole Latitude: 52.921853
Surface Hole Longitude: -113.747375

For data sources see[1][2]

Well History

Date Event
2001-07-19 Obtained License
2001-08-03 Surface Casing Operation Performed
2001-08-05 Direction Drilling Operation Performed - Deviate
2001-08-09 Finished Drilling
2001-08-09 Well Log Performed
2001-08-09 Well Mode changed to Drilled and Cased
2001-08-10 Well Log Performed
2001-08-11 Production Casing Operation Performed
2001-08-11 Rig Released
2001-08-18 Perforation Treatment Performed - Jet Perforation
2001-08-18 Well Log Performed
2001-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-19 Perforation Treatment Performed - Jet Perforation
2001-08-19 Plug Back Performed
2001-08-19 Well Log Performed
2001-08-21 Perforation Treatment Performed - Fractured
2002-01-18 Well Began Production
2002-01-18 Well Fluid changed to Gas
2002-01-18 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Gas
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-08-05 1008.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-08-18 Perforation 1514.00 1517.00 17
2001-08-19 Packing Device Capped w/Cement 1492.00 1500.00 0
2001-08-19 Perforation 1414.00 1415.50 17
2001-08-21 Fracture 1414.00 1415.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 48 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8316 0.0 0.0 0.0
2004 8558 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 7667 0.0 0.0 0.0
2007 7660 0.0 0.0 0.0
2008 8661 0.0 0.0 0.0
2009 8039 0.0 0.0 0.0
2010 7823 0.0 0.0 0.0
2011 7271 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 7655 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8327 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[6]

References