X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454282304000

Well Details

Well ID: 0454282304000
Loading map...
Location: 00/04-23-045-28W4/0
Location Alias: 00/04-23-45-28 W4M
Location Alias 2: 00/04-23-045-28 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 28
Section: 23
County/Municipality: County of Wetaskiwin No. 10
Well Name: FORGE FBANK 4-23-45-28
Operator Name: Forge Oil & Gas Limited
License Number: 0433867
License Date: 2011-05-27
License Status: Issued
Spud Date: 2011-06-14
Final Drill Date: 2011-06-15
Well Total Depth: 756.00 m
Surface Hole Latitude: 52.887482
Surface Hole Longitude: -113.969324

For data sources see[1][2]

Well History

Date Event
2011-05-27 Obtained License
2011-06-14 Surface Casing Operation Performed
2011-06-15 Finished Drilling
2011-06-15 Well Mode changed to Drilled and Cased
2011-06-16 Production Casing Operation Performed
2011-06-16 Rig Released
2011-07-31 Well Log Performed
2011-08-06 Perforation Treatment Performed - Jet Perforation
2011-08-06 Well Log Performed
2011-08-20 Perforation Treatment Performed - Fractured
2011-09-06 Well Log Performed
2012-01-25 Well Began Production
2012-01-25 Well Fluid changed to Coalbed Methane-Coals Only
2012-01-25 Well Mode changed to Flowing
2012-11-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-06 Perforation 606.80 607.30 13
2011-08-06 Perforation 543.70 544.20 13
2011-08-06 Perforation 522.30 523.00 13
2011-08-06 Perforation 518.10 518.60 13
2011-08-06 Perforation 480.90 482.10 13
2011-08-06 Perforation 468.60 469.10 13
2011-08-06 Perforation 463.90 464.40 13
2011-08-06 Perforation 408.50 409.20 13
2011-08-06 Perforation 371.30 372.00 13
2011-08-06 Perforation 361.50 362.00 13
2011-08-06 Perforation 344.00 344.50 13
2011-08-06 Perforation 603.20 603.80 13
2011-08-20 Fracture 606.80 607.30 0
2011-08-20 Fracture 603.20 603.80 0
2011-08-20 Fracture 593.80 594.30 0
2011-08-20 Fracture 591.90 592.40 0
2011-08-20 Fracture 584.00 584.60 0
2011-08-20 Fracture 580.20 580.80 0
2011-08-20 Fracture 560.20 561.00 0
2011-08-20 Fracture 551.90 553.00 0
2011-08-20 Fracture 548.20 549.10 0
2011-08-20 Fracture 543.70 544.20 0
2011-08-06 Perforation 593.80 594.30 13
2011-08-20 Fracture 522.30 523.00 0
2011-08-20 Fracture 518.10 518.60 0
2011-08-20 Fracture 480.90 482.10 0
2011-08-20 Fracture 468.60 469.10 0
2011-08-20 Fracture 463.90 464.40 0
2011-08-20 Fracture 408.50 409.20 0
2011-08-20 Fracture 371.30 372.00 0
2011-08-20 Fracture 361.50 362.00 0
2011-08-20 Fracture 344.00 344.50 0
2011-08-06 Perforation 591.90 592.40 13
2011-08-06 Perforation 584.00 584.60 13
2011-08-06 Perforation 580.20 580.80 13
2011-08-06 Perforation 560.20 561.00 13
2011-08-06 Perforation 551.90 553.00 13
2011-08-06 Perforation 548.20 549.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8043 0.0 0.0 0.0
2013 8645 0.0 0.0 0.0
2014 8539 0.0 0.0 0.0
2015 8220 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8526 0.0 0.0 0.0
2018 8651 0.0 0.0 0.0
2019 8671 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References