X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454282713000

Well Details

Well ID: 0454282713000
Loading map...
Location: 00/13-27-045-28W4/0
Location Alias: 00/13-27-45-28 W4M
Location Alias 2: 00/13-27-045-28 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 28
Section: 27
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 13-27-45-28
Operator Name: Cenovus Energy Inc.
License Number: 0129667
License Date: 1987-10-26
License Status: RecCertified
Spud Date: 1987-10-30
Final Drill Date: 1987-11-17
Well Total Depth: 2280.00 m
Surface Hole Latitude: 52.915644
Surface Hole Longitude: -113.993500

For data sources see[1][2]

Well History

Date Event
1987-10-26 Obtained License
1987-10-31 Lost Circulation Occurred
1987-11-01 Surface Casing Operation Performed
1987-11-17 Finished Drilling
1987-11-17 Well Mode changed to Drilled and Cased
1987-11-18 Well Log Performed
1987-11-22 Production Casing Operation Performed
1987-11-22 Rig Released
1987-12-02 Perforation Treatment Performed - Jet Perforation
1987-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-14 Well Began Production
1988-03-14 Well Fluid changed to Crude Oil
1988-03-14 Well Mode changed to Gas Lift
1989-06-27 Well Log Performed
1989-07-09 Perforation Treatment Performed - Cement Squeeze
1989-07-11 Perforation Treatment Performed - Jet Perforation
1989-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-14 Perforation Treatment Performed - Jet Perforation
1989-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-31 Perforation Treatment Performed - Jet Perforation
1990-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-06 Well Log Performed
1990-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-08 Perforation Treatment Performed - Jet Perforation
1990-08-08 Perforation Treatment Performed - Remedial Casing
1990-08-10 Well Log Performed
1994-11-03 Well Log Performed
1994-11-10 Well Log Performed
1994-12-06 Well Log Performed
1998-03-28 Well Log Performed
1998-03-29 Perforation Treatment Performed - Jet Perforation
1998-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-01 Well Fluid changed to Crude Oil
1999-03-01 Well Mode changed to Suspended
2003-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-27 Plug Back Performed
2003-06-27 Well Fluid changed to Crude Oil
2003-06-27 Well Mode changed to Abandoned Zone
2003-06-30 Perforation Treatment Performed - Cement Squeeze
2003-06-30 Perforation Treatment Performed - Jet Perforation
2003-06-30 Well Log Performed
2003-07-03 Perforation Treatment Performed - Cement Squeeze
2003-07-03 Perforation Treatment Performed - Jet Perforation
2003-07-03 Well Log Performed
2003-07-04 Perforation Treatment Performed - Cement Squeeze
2003-07-04 Perforation Treatment Performed - Jet Perforation
2003-07-04 Well Log Performed
2003-07-05 Perforation Treatment Performed - Cement Squeeze
2003-07-05 Perforation Treatment Performed - Jet Perforation
2003-07-06 Well Log Performed
2003-07-26 Well Abandoned
2003-07-26 Well Fluid changed to Crude Oil
2003-07-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-12-02 Perforation 2254.00 2255.00 13
1990-08-03 Acid Treatment 2256.50 2258.00 0
1990-08-08 Perforation 2260.00 2260.50 13
1990-08-08 Acid Treatment 2259.70 2260.70 0
1990-08-08 Remedial Casing Cementing 2254.00 2255.50 0
1990-08-08 Remedial Casing Cementing 2242.50 2243.50 0
1990-08-08 Remedial Casing Cementing 2256.50 2258.00 0
1990-08-08 Remedial Casing Cementing 2260.00 2260.50 0
1998-03-29 Perforation 2240.00 2241.50 17
1998-03-30 Acid Treatment 2240.00 2241.50 0
2003-06-27 Packing Device Capped w/Cement 2226.00 2234.00 0
1987-12-04 Acid Treatment 2254.00 2255.00 0
2003-06-30 Perforation 391.00 391.50 20
2003-06-30 Cement Squeeze 391.00 391.50 0
2003-07-03 Perforation 310.00 310.50 20
2003-07-03 Cement Squeeze 310.00 310.50 0
2003-07-04 Perforation 300.00 300.50 20
2003-07-04 Cement Squeeze 300.00 300.50 0
2003-07-05 Perforation 260.00 260.50 20
2003-07-05 Cement Squeeze 260.00 260.50 0
1989-07-09 Cement Squeeze 2254.00 2255.00 0
1989-07-11 Perforation 2254.00 2255.50 13
1989-07-12 Acid Treatment 2254.00 2255.50 0
1989-07-14 Perforation 2242.50 2243.50 13
1989-07-18 Acid Treatment 2242.50 2243.50 0
1989-12-15 Acid Treatment 2242.50 2255.50 0
1990-07-31 Perforation 2256.50 2258.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 5219 0.0 0.0 0.0
1989 6843 0.0 0.0 0.0
1990 2594 0.0 0.0 0.0
1991 2725 0.0 0.0 0.0
1992 3977 0.0 0.0 0.0
1993 2141 0.0 0.0 0.0
1994 2800 0.0 0.0 0.0
1995 8343 0.0 0.0 0.0
1996 8733 0.0 0.0 0.0
1997 8355 0.0 0.0 0.0
1998 5073 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-10-31 Lost Circulation 63.00 63.00

For data sources see[6]

References