X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454282808000

Well Details

Well ID: 0454282808000
Loading map...
Location: 00/08-28-045-28W4/0
Location Alias: 00/08-28-45-28 W4M
Location Alias 2: 00/08-28-045-28 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 28
Section: 28
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 8-28-45-28
Operator Name: Cenovus Energy Inc.
License Number: 0102476
License Date: 1983-08-02
License Status: Abandoned
Spud Date: 1983-08-20
Final Drill Date: 1983-09-14
Well Total Depth: 2265.00 m
Surface Hole Latitude: 52.908600
Surface Hole Longitude: -114.000033

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-08-02 Obtained License
1983-08-20 Direction Drilling Operation Performed - 98
1983-09-14 Finished Drilling
1983-09-14 Well Log Performed
1983-09-14 Well Mode changed to Drilled and Cased
1983-09-16 Drill Stem Test Performed
1983-09-19 Production Casing Operation Performed
1983-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-27 Perforation Treatment Performed - Jet Perforation
1983-09-27 Well Began Production
1983-09-27 Well Fluid changed to Crude Oil
1983-09-27 Well Mode changed to Flowing
1984-02-16 Well Fluid changed to Crude Oil
1984-02-16 Well Mode changed to Gas Lift
1984-07-26 Perforation Treatment Performed - Cement Squeeze
1984-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-28 Perforation Treatment Performed - Jet Perforation
1984-07-29 Perforation Treatment Performed - Remedial Casing
1984-07-30 Perforation Treatment Performed - Jet Perforation
1984-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-25 Well Log Performed
1991-07-27 Perforation Treatment Performed - Cement Squeeze
1991-07-31 Well Log Performed
1991-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-01 Perforation Treatment Performed - Jet Perforation
1991-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-07 Well Log Performed
1991-08-08 Perforation Treatment Performed - Jet Perforation
1991-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-01 Well Fluid changed to Crude Oil
1999-05-01 Well Mode changed to Suspended
2003-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-08 Plug Back Performed
2003-07-08 Well Fluid changed to Crude Oil
2003-07-08 Well Log Performed
2003-07-08 Well Mode changed to Abandoned Zone
2003-07-09 Perforation Treatment Performed - Cement Squeeze
2003-07-09 Perforation Treatment Performed - Jet Perforation
2003-07-09 Well Log Performed
2003-07-10 Perforation Treatment Performed - Cement Squeeze
2003-07-10 Perforation Treatment Performed - Jet Perforation
2003-07-10 Well Log Performed
2003-07-11 Well Log Performed
2003-07-24 Well Abandoned
2003-07-24 Well Fluid changed to Crude Oil
2003-07-24 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-08-20 1440.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-27 Perforation 2241.00 2243.50 13
1991-08-01 Perforation 2252.50 2253.50 13
1991-08-01 Acid Treatment 2252.50 2253.50 0
1991-08-03 Acid Treatment 2252.50 2253.50 0
1991-08-08 Perforation 2249.30 2250.30 13
1991-08-09 Acid Treatment 2249.30 2250.30 0
1995-06-23 Acid Treatment 2249.30 2253.50 0
2003-07-08 Packing Device Capped w/Cement 2227.00 2235.00 0
2003-07-09 Perforation 373.00 373.50 20
2003-07-09 Cement Squeeze 373.00 373.50 0
2003-07-10 Perforation 274.00 274.50 20
1983-09-27 Acid Treatment 2241.00 2243.50 0
2003-07-10 Cement Squeeze 274.00 274.50 0
1984-07-26 Cement Squeeze 2241.00 2243.50 0
1984-07-28 Perforation 2248.00 2250.00 13
1984-07-28 Acid Treatment 2248.00 2250.00 0
1984-07-29 Remedial Casing Cementing 2248.00 2250.00 0
1984-07-30 Perforation 2241.00 2243.50 0
1984-07-31 Acid Treatment 2241.00 2243.50 0
1991-07-27 Cement Squeeze 2241.00 2243.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 185 0.0 0.0 0.0
1984 3524 0.0 0.0 0.0
1985 2105 0.0 0.0 0.0
1986 2272 0.0 0.0 0.0
1987 1579 0.0 0.0 0.0
1988 1112 0.0 0.0 0.0
1990 1119 0.0 0.0 0.0
1991 1599 0.0 0.0 0.0
1992 2981 0.0 0.0 0.0
1993 1563 0.0 0.0 0.0
1994 48 0.0 0.0 0.0
1995 5679 0.0 0.0 0.0
1996 6105 0.0 0.0 0.0
1997 4398 0.0 0.0 0.0
1998 72 0.0 0.0 0.0

For data sources see[6]

References