X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454282816000

Well Details

Well ID: 0454282816000
Loading map...
Location: 00/16-28-045-28W4/0
Location Alias: 00/16-28-45-28 W4M
Location Alias 2: 00/16-28-045-28 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 28
Section: 28
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 16-28-45-28
Operator Name: Cenovus Energy Inc.
License Number: 0099847
License Date: 1982-12-17
License Status: Abandoned
Spud Date: 1983-01-06
Final Drill Date: 1983-01-26
Well Total Depth: 2278.00 m
Surface Hole Latitude: 52.915359
Surface Hole Longitude: -113.999619

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-12-17 Obtained License
1983-01-26 Finished Drilling
1983-01-26 Well Mode changed to Drilled and Cased
1983-01-29 Production Casing Operation Performed
1983-02-11 Perforation Treatment Performed - Jet Perforation
1983-02-11 Well Began Production
1983-02-11 Well Fluid changed to Crude Oil
1983-02-11 Well Mode changed to Flowing
1983-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-21 Well Fluid changed to Crude Oil
1983-10-21 Well Mode changed to Pumping
1985-02-06 Perforation Treatment Performed - Jet Perforation
1985-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-19 Perforation Treatment Performed - Cement Squeeze
1985-02-21 Perforation Treatment Performed - Jet Perforation
1985-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-23 Perforation Treatment Performed - Remedial Casing
1985-02-26 Perforation Treatment Performed - Jet Perforation
1985-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-02 Well Fluid changed to Crude Oil
1985-03-02 Well Mode changed to Gas Lift
1991-02-13 Perforation Treatment Performed - Cement Squeeze
1991-02-23 Perforation Treatment Performed - Jet Perforation
1991-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-27 Perforation Treatment Performed - Cement Squeeze
1991-03-05 Perforation Treatment Performed - Jet Perforation
1991-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-28 Perforation Treatment Performed - Cement Squeeze
1992-07-08 Well Log Performed
2000-08-01 Well Fluid changed to Crude Oil
2000-08-01 Well Mode changed to Suspended
2003-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-16 Perforation Treatment Performed - Jet Perforation
2003-07-16 Plug Back Performed
2003-07-16 Well Fluid changed to Crude Oil
2003-07-16 Well Log Performed
2003-07-16 Well Mode changed to Abandoned Zone
2003-07-17 Perforation Treatment Performed - Remedial Casing
2003-07-18 Well Log Performed
2003-07-19 Perforation Treatment Performed - Jet Perforation
2003-07-19 Perforation Treatment Performed - Remedial Casing
2003-07-19 Well Log Performed
2003-07-20 Well Log Performed
2004-01-18 Well Abandoned
2004-01-18 Well Fluid changed to Crude Oil
2004-01-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-02-11 Perforation 2248.00 2250.00 13
1985-02-26 Perforation 2250.50 2253.00 13
1985-02-28 Acid Treatment 2250.50 2253.00 0
1991-02-13 Cement Squeeze 2250.50 2253.00 0
1991-02-23 Perforation 2257.50 2258.50 7
1991-02-26 Acid Treatment 2257.50 2258.50 0
1991-02-27 Cement Squeeze 2257.50 2258.50 0
1991-03-05 Perforation 2254.50 2256.00 7
1991-03-06 Acid Treatment 2254.50 2256.00 0
1992-06-28 Cement Squeeze 2254.50 2256.00 0
2003-07-16 Packing Device Capped w/Cement 1995.70 2003.70 0
1983-10-19 Acid Treatment 2248.00 2250.00 0
2003-07-16 Perforation 413.00 413.50 20
2003-07-17 Remedial Casing Cementing 413.00 413.50 0
2003-07-19 Perforation 280.00 280.50 20
2003-07-19 Remedial Casing Cementing 280.00 280.50 0
1985-02-06 Perforation 2246.20 2248.00 13
1985-02-07 Acid Treatment 2246.20 2248.00 0
1985-02-16 Acid Treatment 2246.20 2250.00 0
1985-02-19 Cement Squeeze 2246.20 2250.00 0
1985-02-21 Perforation 2254.50 2255.50 13
1985-02-22 Acid Treatment 2254.50 2255.50 0
1985-02-23 Remedial Casing Cementing 2254.50 2255.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 4212 0.0 0.0 0.0
1984 7468 0.0 0.0 0.0
1985 4549 0.0 0.0 0.0
1986 3639 0.0 0.0 0.0
1987 6776 0.0 0.0 0.0
1988 8370 0.0 0.0 0.0
1989 7419 0.0 0.0 0.0
1990 3161 0.0 0.0 0.0
1991 1080 0.0 0.0 0.0
1992 25 0.0 0.0 0.0

For data sources see[5]

References