X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454283308000

Well Details

Well ID: 0454283308000
Loading map...
Location: 00/08-33-045-28W4/0
Location Alias: 00/08-33-45-28 W4M
Location Alias 2: 00/08-33-045-28 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 28
Section: 33
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 8-33-45-28
Operator Name: Cenovus Energy Inc.
License Number: 0006698
License Date: 1953-07-10
License Status: Abandoned
Spud Date: 1953-07-26
Final Drill Date: 1953-09-16
Well Total Depth: 2274.00 m
Surface Hole Latitude: 52.921515
Surface Hole Longitude: -113.998064

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-10 Obtained License
1953-09-12 Liner Casing Operation Performed
1953-09-16 Finished Drilling
1953-09-16 Perforation Treatment Performed - Open-Hole Completion
1953-09-16 Well Mode changed to Drilled and Cased
1953-09-18 Well Began Production
1953-09-18 Well Fluid changed to Crude Oil
1953-09-18 Well Mode changed to Flowing
1965-01-14 Perforation Treatment Performed - Selective Jet Perforations
1972-07-25 Well Log Performed
1972-11-10 Well Log Performed
1973-04-10 Well Log Performed
1976-08-11 Well Log Performed
1977-05-23 Well Log Performed
1977-09-15 Well Log Performed
1978-01-24 Well Log Performed
1978-05-28 Well Log Performed
1978-06-05 Well Log Performed
1978-11-09 Well Log Performed
1979-06-01 Well Log Performed
1979-11-28 Well Log Performed
1980-12-11 Well Log Performed
1982-06-01 Perforation Treatment Performed - Open-Hole Completion
1982-06-02 Perforation Treatment Performed - Cement Squeeze
1982-06-08 Perforation Treatment Performed - Jet Perforation
1982-09-17 Perforation Treatment Performed - Fractured
1982-09-17 Well Fluid changed to Crude Oil
1982-09-17 Well Mode changed to Gas Lift
1985-05-22 Perforation Treatment Performed - Cement Squeeze
1985-05-27 Perforation Treatment Performed - Jet Perforation
1985-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-25 Perforation Treatment Performed - Cement Squeeze
1990-09-27 Perforation Treatment Performed - Jet Perforation
1990-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-01 Well Log Performed
1990-10-02 Perforation Treatment Performed - Cement Squeeze
1990-10-04 Perforation Treatment Performed - Jet Perforation
1990-10-04 Well Log Performed
1990-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-17 Well Log Performed
1990-10-22 Perforation Treatment Performed - Cement Squeeze
1990-10-24 Perforation Treatment Performed - Jet Perforation
1990-10-24 Well Log Performed
1990-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-15 Perforation Treatment Performed - Cement Squeeze
1996-10-15 Well Log Performed
1996-10-16 Perforation Treatment Performed - Jet Perforation
1996-10-16 Well Log Performed
1996-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-23 Perforation Treatment Performed - Jet Perforation
1997-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-10 Well Log Performed
1998-06-11 Perforation Treatment Performed - Jet Perforation
1998-06-11 Well Log Performed
1998-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-06 Well Log Performed
1999-02-07 Perforation Treatment Performed - Jet Perforation
2000-05-10 Perforation Treatment Performed - Jet Perforation
2000-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-01-24 Well Log Performed
2001-01-25 Perforation Treatment Performed - Jet Perforation
2001-01-25 Well Log Performed
2001-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-05 Perforation Treatment Performed - Jet Perforation
2001-10-05 Well Log Performed
2003-09-01 Well Fluid changed to Crude Oil
2003-09-01 Well Mode changed to Suspended
2013-02-15 Well Log Performed
2013-02-19 Well Log Performed
2013-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-02 Plug Back Performed
2013-03-02 Well Fluid changed to Crude Oil
2013-03-02 Well Mode changed to Abandoned Zone
2013-03-04 Perforation Treatment Performed - Jet Perforation
2013-03-04 Well Log Performed
2013-03-05 Perforation Treatment Performed - Remedial Casing
2013-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-06 Perforation Treatment Performed - Jet Perforation
2013-03-06 Perforation Treatment Performed - Remedial Casing
2013-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-08 Perforation Treatment Performed - Jet Perforation
2013-03-08 Well Log Performed
2013-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-09 Perforation Treatment Performed - Remedial Casing
2013-03-10 Perforation Treatment Performed - Jet Perforation
2013-03-10 Well Log Performed
2013-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-12 Perforation Treatment Performed - Remedial Casing
2013-03-20 Well Abandoned
2013-03-20 Well Fluid changed to Crude Oil
2013-03-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-09-16 Open Hole/Barefoot Completion 2227.20 2235.70 0
1965-01-14 Selective Jet Perforations 2182.70 2184.20 0
1965-01-14 Selective Jet Perforations 2185.70 2187.20 0
1965-01-14 Selective Jet Perforations 2188.80 2190.30 0
1965-01-14 Selective Jet Perforations 2191.80 2193.30 0
1965-01-14 Selective Jet Perforations 2194.90 2196.40 0
1965-01-14 Selective Jet Perforations 2197.90 2199.40 0
1965-01-14 Selective Jet Perforations 2201.00 2202.50 0
1965-01-14 Selective Jet Perforations 2204.00 2205.50 0
1965-01-14 Selective Jet Perforations 2207.10 2208.60 0
1965-01-14 Selective Jet Perforations 2210.10 2211.60 0
1965-01-14 Selective Jet Perforations 2158.30 2159.80 0
1965-01-14 Selective Jet Perforations 2213.20 2214.70 0
1965-01-14 Selective Jet Perforations 2216.20 2217.70 0
1965-01-14 Selective Jet Perforations 2219.20 2220.80 0
1965-01-14 Selective Jet Perforations 2222.30 2223.80 0
1965-01-14 Selective Jet Perforations 2225.30 2226.90 0
1982-06-01 Open Hole/Barefoot Completion 2227.20 2274.00 0
1982-06-02 Cement Squeeze 2158.30 2274.00 0
1982-06-08 Perforation 2231.50 2233.00 13
1982-09-17 Fracture 2231.50 2233.00 0
1985-05-22 Cement Squeeze 2231.50 2233.00 0
1965-01-14 Selective Jet Perforations 2161.30 2162.90 0
1985-05-27 Perforation 2237.70 2239.20 13
1985-05-28 Acid Treatment 2237.70 2239.20 0
1990-09-25 Cement Squeeze 2237.70 2239.20 0
1990-09-27 Perforation 2247.00 2248.00 13
1990-09-28 Acid Treatment 2247.00 2248.00 0
1990-10-02 Cement Squeeze 2247.00 2248.00 0
1990-10-04 Perforation 2243.50 2245.50 13
1990-10-05 Acid Treatment 2243.50 2245.50 0
1990-10-22 Cement Squeeze 2243.50 2245.50 0
1990-10-24 Perforation 2241.00 2242.00 13
1965-01-14 Selective Jet Perforations 2164.40 2165.90 0
1990-10-25 Acid Treatment 2241.00 2242.00 0
1996-10-15 Cement Squeeze 2241.00 2242.00 0
1996-10-16 Perforation 2237.00 2238.50 20
1996-10-17 Acid Treatment 2237.00 2238.50 0
1997-09-23 Perforation 2230.50 2232.00 14
1997-09-24 Acid Treatment 2230.50 2232.00 0
1998-06-11 Perforation 2216.50 2218.00 32
1998-06-12 Acid Treatment 2216.50 2218.00 0
1999-02-07 Perforation 2191.00 2194.00 17
1999-02-07 Perforation 2203.00 2206.00 17
1965-01-14 Selective Jet Perforations 2167.40 2169.00 0
2000-05-10 Perforation 2145.00 2148.00 17
2000-05-10 Perforation 2168.00 2171.00 17
2000-05-11 Acid Treatment 2145.00 2171.00 0
2001-01-25 Perforation 2165.00 2166.00 17
2001-01-25 Perforation 2162.00 2163.00 17
2001-01-25 Perforation 2159.00 2160.00 17
2001-01-25 Perforation 2156.00 2157.00 17
2001-01-25 Perforation 2153.00 2154.00 17
2001-01-25 Perforation 2150.00 2151.00 17
2001-01-26 Acid Treatment 2145.00 2166.00 0
1965-01-14 Selective Jet Perforations 2170.50 2172.00 0
2001-10-05 Perforation 2106.00 2109.00 17
2001-10-05 Perforation 2102.00 2104.00 17
2001-10-05 Acid Treatment 2102.00 2109.00 0
2013-03-02 Packing Device Capped w/Cement 2087.00 2095.00 0
2013-03-04 Perforation 1344.00 1345.00 13
2013-03-04 Perforation 1244.00 1245.00 13
2013-03-05 Remedial Casing Cementing 1244.00 1345.00 0
2013-03-06 Perforation 1089.00 1090.00 13
2013-03-06 Packing Device Capped w/Cement 1074.00 1082.00 0
2013-03-06 Perforation 961.00 962.00 13
1965-01-14 Selective Jet Perforations 2173.50 2175.10 0
2013-03-06 Remedial Casing Cementing 961.00 962.00 0
2013-03-07 Packing Device Capped w/Cement 947.00 955.00 0
2013-03-08 Perforation 673.00 674.00 13
2013-03-09 Remedial Casing Cementing 673.00 674.00 0
2013-03-09 Packing Device Capped w/Cement 660.00 668.00 0
2013-03-10 Perforation 474.00 475.00 13
2013-03-12 Remedial Casing Cementing 474.00 475.00 0
2013-03-12 Packing Device Capped w/Cement 458.00 466.00 0
1965-01-14 Selective Jet Perforations 2176.60 2178.10 0
1965-01-14 Selective Jet Perforations 2179.60 2181.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1982 1857 0.0 0.0 0.0
1983 5759 0.0 0.0 0.0
1984 6525 0.0 0.0 0.0
1985 3595 0.0 0.0 0.0
1986 4338 0.0 0.0 0.0
1987 6759 0.0 0.0 0.0
1988 8324 0.0 0.0 0.0
1989 8489 0.0 0.0 0.0
1990 5835 0.0 0.0 0.0
1991 7978 0.0 0.0 0.0
1992 8141 0.0 0.0 0.0
1993 8390 0.0 0.0 0.0
1994 8221 0.0 0.0 0.0
1995 8429 0.0 0.0 0.0
1996 6284 0.0 0.0 0.0
1997 7717 0.0 0.0 0.0
1998 6467 0.0 0.0 0.0
1999 7751 0.0 0.0 0.0
2000 8286 0.0 0.0 0.0
2001 8160 0.0 0.0 0.0
2002 8708 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References