X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455011111000

Well Details

Well ID: 0455011111000
Loading map...
Location: 00/11-11-045-01W5/0
Location Alias: 00/11-11-45-01 W5M
Location Alias 2: 00/11-11-045-01 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 01
Section: 11
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE PEMBINA 11-11-45-1
Operator Name: Cenovus Energy Inc.
License Number: 0156021
License Date: 1993-01-27
License Status: Amended
Spud Date: 1993-01-28
Final Drill Date: 1993-02-07
Well Total Depth: 2301.50 m
Surface Hole Latitude: 52.868312
Surface Hole Longitude: -114.043623

For data sources see[1][2]

Well History

Date Event
1993-01-27 Obtained License
1993-01-29 Surface Casing Operation Performed
1993-02-07 Finished Drilling
1993-02-07 Well Mode changed to Drilled and Cased
1993-02-08 Well Log Performed
1993-02-10 Production Casing Operation Performed
1993-02-10 Rig Released
1993-03-05 Well Log Performed
1993-03-09 Perforation Treatment Performed - Open-Hole Completion
1993-03-12 Well Log Performed
1993-03-13 Well Log Performed
1993-03-16 Perforation Treatment Performed - Jet Perforation
1993-03-16 Well Log Performed
1993-03-17 Perforation Treatment Performed - Jet Perforation
1993-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-26 Well Began Production
1993-04-26 Well Fluid changed to Gas
1993-04-26 Well Mode changed to Flowing
1994-03-03 Well Log Performed
1994-05-20 Well Log Performed
1997-01-29 Well Log Performed
1997-01-30 Well Log Performed
1997-04-16 Well Began Injection
1997-04-16 Well Fluid changed to Water
1997-04-16 Well Type changed to Injection
2011-04-01 Well Fluid changed to Water
2011-04-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-09 Open Hole/Barefoot Completion 2160.00 2301.50 0
1993-03-16 Perforation 2288.00 2295.00 20
1993-03-16 Perforation 2288.00 2294.50 20
1993-03-16 Perforation 2295.00 2301.00 20
1993-03-17 Perforation 2294.50 2301.00 20
1993-03-21 Acid Treatment 2288.00 2301.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5095 0.0 0.0 0.0
1994 1723 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References