X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455012508000

Well Details

Well ID: 0455012508000
Loading map...
Location: 00/08-25-045-01W5/0
Location Alias: 00/08-25-45-01 W5M
Location Alias 2: 00/08-25-045-01 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 01
Section: 25
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 8-25-45-1
Operator Name: Cenovus Energy Inc.
License Number: 0108589
License Date: 1984-08-07
License Status: RecCertified
Spud Date: 1984-08-22
Final Drill Date: 1984-09-07
Well Total Depth: 2277.20 m
Surface Hole Latitude: 52.907837
Surface Hole Longitude: -114.006290

For data sources see[1][2]

Well History

Date Event
1984-08-07 Obtained License
1984-08-22 Lost Circulation Occurred
1984-08-23 Surface Casing Operation Performed
1984-09-07 Finished Drilling
1984-09-07 Well Mode changed to Drilled and Cased
1984-09-10 Well Log Performed
1984-09-11 Well Log Performed
1984-09-12 Production Casing Operation Performed
1984-09-12 Well Log Performed
1984-09-13 Rig Released
1984-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-23 Perforation Treatment Performed - Jet Perforation
1984-09-24 Well Began Production
1984-09-24 Well Fluid changed to Crude Oil
1984-09-24 Well Mode changed to Flowing
1984-09-26 Well Fluid changed to Crude Oil
1984-09-26 Well Mode changed to Suspended
1984-11-25 Well Fluid changed to Crude Oil
1984-11-25 Well Mode changed to Flowing
1989-05-21 Well Log Performed
1989-12-14 Well Log Performed
1990-09-20 Well Log Performed
1991-03-08 Well Log Performed
1991-03-13 Perforation Treatment Performed - Cement Squeeze
1991-03-19 Perforation Treatment Performed - Jet Perforation
1991-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-04 Well Log Performed
1993-07-27 Perforation Treatment Performed - Cement Squeeze
1993-08-01 Perforation Treatment Performed - Jet Perforation
1993-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-09 Perforation Treatment Performed - Jet Perforation
1993-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-10 Well Log Performed
1993-12-09 Perforation Treatment Performed - Jet Perforation
1994-10-26 Perforation Treatment Performed - Jet Perforation
1994-10-26 Well Log Performed
1994-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-01 Well Log Performed
1995-05-12 Well Log Performed
1995-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-05 Well Log Performed
1996-11-05 Well Log Performed
1997-03-26 Well Log Performed
1997-05-27 Well Log Performed
1997-06-30 Well Log Performed
1997-07-29 Well Log Performed
1997-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-29 Well Log Performed
1997-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-04 Well Log Performed
1997-09-29 Well Log Performed
1998-11-30 Well Log Performed
1998-12-02 Perforation Treatment Performed - Jet Perforation
1998-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-14 Well Log Performed
1999-06-15 Perforation Treatment Performed - Jet Perforation
1999-06-15 Well Log Performed
1999-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-20 Perforation Treatment Performed - Jet Perforation
2000-03-20 Well Log Performed
2000-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-24 Perforation Treatment Performed - Jet Perforation
2001-07-24 Well Log Performed
2003-09-01 Well Fluid changed to Crude Oil
2003-09-01 Well Mode changed to Suspended
2005-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-28 Perforation Treatment Performed - Jet Perforation
2005-07-28 Plug Back Performed
2005-07-28 Well Fluid changed to Crude Oil
2005-07-28 Well Mode changed to Abandoned Zone
2005-08-02 Perforation Treatment Performed - Jet Perforation
2005-08-02 Perforation Treatment Performed - Remedial Casing
2005-08-03 Perforation Treatment Performed - Jet Perforation
2005-08-03 Perforation Treatment Performed - Remedial Casing
2005-08-04 Perforation Treatment Performed - Remedial Casing
2005-08-26 Well Abandoned
2005-08-26 Well Fluid changed to Crude Oil
2005-08-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-23 Perforation 2239.00 2243.50 13
1993-11-09 Perforation 2252.50 2254.50 18
1993-11-10 Acid Treatment 2248.00 2254.50 0
1993-12-09 Perforation 2247.00 2248.00 18
1994-10-26 Perforation 2232.00 2250.00 13
1994-10-29 Acid Treatment 2232.00 2254.50 0
1995-06-08 Acid Treatment 2240.10 2248.10 0
1997-08-29 Packing Device Capped w/Cement 2250.20 2252.00 0
1997-09-04 Packing Device Capped w/Cement 2239.00 2242.00 0
1998-12-02 Perforation 2218.50 2220.00 17
1998-12-03 Acid Treatment 2218.50 2220.00 0
1984-09-23 Acid Treatment 2239.00 2243.50 0
1999-06-15 Perforation 2192.50 2213.00 17
1999-06-16 Acid Treatment 2192.50 2213.00 0
2000-03-20 Perforation 2152.00 2155.00 17
2000-03-20 Perforation 2175.00 2178.00 17
2000-03-21 Acid Treatment 2152.00 2178.00 0
2001-07-24 Perforation 2134.50 2137.50 17
2001-07-24 Perforation 2125.50 2131.50 17
2001-07-24 Acid Treatment 2125.50 2137.50 0
2005-07-28 Packing Device Capped w/Cement 2107.00 2115.00 0
2005-07-28 Perforation 847.00 848.00 20
1991-03-13 Cement Squeeze 2239.00 2243.50 0
2005-08-02 Remedial Casing Cementing 847.00 848.00 0
2005-08-02 Perforation 831.00 832.00 20
2005-08-03 Remedial Casing Cementing 831.00 832.00 0
2005-08-03 Perforation 516.00 517.00 20
2005-08-04 Remedial Casing Cementing 516.00 517.00 0
1991-03-19 Perforation 2245.00 2246.00 14
1991-03-20 Acid Treatment 2245.00 2246.00 0
1993-07-27 Cement Squeeze 2245.00 2246.00 0
1993-08-01 Perforation 2250.00 2251.00 13
1993-08-02 Acid Treatment 2250.00 2251.00 0
1993-11-09 Perforation 2248.00 2249.00 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 819 0.0 0.0 0.0
1985 7359 0.0 0.0 0.0
1986 5963 0.0 0.0 0.0
1987 7189 0.0 0.0 0.0
1988 8352 0.0 0.0 0.0
1989 7567 0.0 0.0 0.0
1990 7300 0.0 0.0 0.0
1991 7387 0.0 0.0 0.0
1992 7679 0.0 0.0 0.0
1993 4631 0.0 0.0 0.0
1994 72 0.0 0.0 0.0
1995 24 0.0 0.0 0.0
1996 22 0.0 0.0 0.0
1997 2453 0.0 0.0 0.0
1998 8259 0.0 0.0 0.0
1999 7650 0.0 0.0 0.0
2000 7169 0.0 0.0 0.0
2001 8478 0.0 0.0 0.0
2002 4984 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-08-22 Lost Circulation 43.50 43.50

For data sources see[6]

References