X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455012509000

Well Details

Well ID: 0455012509000
Loading map...
Location: 00/09-25-045-01W5/0
Location Alias: 00/09-25-45-01 W5M
Location Alias 2: 00/09-25-045-01 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 01
Section: 25
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 9-25-45-1
Operator Name: Cenovus Energy Inc.
License Number: 0007504
License Date: 1953-12-22
License Status: Abandoned
Spud Date: 1954-02-23
Final Drill Date: 1954-04-27
Well Total Depth: 2280.00 m
Surface Hole Latitude: 52.911087
Surface Hole Longitude: -114.004970

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-12-22 Obtained License
1954-02-23 Lost Circulation Occurred
1954-04-22 Liner Casing Operation Performed
1954-04-27 Finished Drilling
1954-04-27 Perforation Treatment Performed - Open-Hole Completion
1954-04-27 Well Mode changed to Drilled and Cased
1954-05-02 Well Began Production
1954-05-02 Well Fluid changed to Crude Oil
1954-05-02 Well Mode changed to Flowing
1974-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-05 Perforation Treatment Performed - Open-Hole Completion
1982-12-06 Perforation Treatment Performed - Cement Squeeze
1982-12-20 Perforation Treatment Performed - Fractured
1982-12-20 Perforation Treatment Performed - Jet Perforation
1982-12-21 Well Fluid changed to Crude Oil
1982-12-21 Well Mode changed to Gas Lift
1985-06-01 Perforation Treatment Performed - Cement Squeeze
1985-06-06 Perforation Treatment Performed - Jet Perforation
1985-09-14 Perforation Treatment Performed - Fractured
1987-02-19 Perforation Treatment Performed - Cement Squeeze
1987-02-24 Perforation Treatment Performed - Jet Perforation
1987-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-12-20 Plug Back Performed
1987-12-21 Perforation Treatment Performed - Jet Perforation
1987-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-31 Well Fluid changed to Crude Oil
1988-10-31 Well Mode changed to Suspended
1988-11-01 Well Fluid changed to Gas
1988-11-01 Well Mode changed to Flowing
1993-05-28 Well Began Injection
1993-05-28 Well Fluid changed to Gas
1993-05-28 Well Type changed to Injection
1993-06-26 Well Log Performed
1995-05-01 Well Fluid changed to Gas
1995-05-01 Well Mode changed to Flowing
1997-05-27 Well Log Performed
1997-05-30 Perforation Treatment Performed - Cement Squeeze
1997-05-30 Well Log Performed
1997-06-02 Perforation Treatment Performed - Cement Squeeze
1997-06-02 Well Log Performed
1997-06-04 Well Log Performed
1997-06-06 Perforation Treatment Performed - Jet Perforation
1997-06-06 Well Log Performed
1997-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-10 Perforation Treatment Performed - Jet Perforation
1997-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-06 Well Log Performed
1999-08-01 Well Fluid changed to Crude Oil
1999-08-01 Well Mode changed to Flowing
1999-10-27 Well Log Performed
1999-10-28 Perforation Treatment Performed - Jet Perforation
1999-10-28 Well Log Performed
1999-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-24 Well Log Performed
2000-09-25 Well Log Performed
2000-09-26 Perforation Treatment Performed - Jet Perforation
2000-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-01 Well Fluid changed to Crude Oil
2003-09-01 Well Mode changed to Suspended
2004-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-12 Plug Back Performed
2004-08-12 Well Fluid changed to Crude Oil
2004-08-12 Well Log Performed
2004-08-12 Well Mode changed to Abandoned Zone
2004-08-13 Well Log Performed
2004-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-16 Perforation Treatment Performed - Jet Perforation
2004-08-16 Well Log Performed
2004-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-17 Perforation Treatment Performed - Jet Perforation
2004-08-17 Well Log Performed
2004-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-18 Perforation Treatment Performed - Jet Perforation
2004-08-18 Well Log Performed
2004-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-19 Perforation Treatment Performed - Jet Perforation
2004-08-19 Well Log Performed
2004-08-21 Perforation Treatment Performed - Jet Perforation
2004-08-21 Well Log Performed
2004-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-23 Perforation Treatment Performed - Jet Perforation
2004-08-23 Well Log Performed
2004-09-08 Well Abandoned
2004-09-08 Well Fluid changed to Crude Oil
2004-09-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-04-27 Open Hole/Barefoot Completion 2240.30 2248.80 0
1987-02-19 Cement Squeeze 2251.30 2252.30 0
1987-02-24 Perforation 2253.00 2254.00 13
1987-02-25 Acid Treatment 2253.00 2254.00 0
1987-12-20 Packing Device Capped w/Cement 2242.00 2245.00 0
1987-12-21 Perforation 2233.00 2239.00 13
1987-12-22 Acid Treatment 2233.00 2239.00 0
1997-05-30 Cement Squeeze 2246.50 2248.50 0
1997-06-02 Cement Squeeze 2233.00 2239.00 0
1997-06-06 Perforation 2243.50 2245.00 17
1997-06-07 Acid Treatment 2243.50 2245.00 0
1974-06-07 Acid Treatment 2240.30 2248.80 0
1997-06-10 Perforation 2223.00 2224.50 17
1997-06-11 Acid Treatment 2223.00 2224.50 0
1999-10-28 Perforation 2192.00 2213.00 16
1999-10-29 Acid Treatment 2192.00 2213.00 0
2000-09-26 Perforation 2187.50 2189.00 17
2000-09-26 Perforation 2183.00 2184.50 17
2000-09-26 Perforation 2178.50 2180.00 17
2000-09-26 Perforation 2174.00 2175.50 17
2000-09-26 Perforation 2169.50 2171.00 17
2000-09-26 Perforation 2165.00 2166.50 17
1982-12-05 Open Hole/Barefoot Completion 2240.30 2280.00 0
2000-09-26 Perforation 2160.50 2162.00 17
2000-09-26 Perforation 2156.00 2157.50 17
2000-09-27 Acid Treatment 2187.50 2189.00 0
2000-09-27 Acid Treatment 2183.00 2184.50 0
2000-09-27 Acid Treatment 2178.50 2180.00 0
2000-09-27 Acid Treatment 2174.00 2175.50 0
2000-09-27 Acid Treatment 2169.50 2171.00 0
2000-09-27 Acid Treatment 2165.00 2166.50 0
2000-09-27 Acid Treatment 2160.50 2162.00 0
2000-09-27 Acid Treatment 2156.00 2157.50 0
1982-12-06 Cement Squeeze 2240.30 2280.00 0
2004-08-12 Packing Device Capped w/Cement 2060.00 2149.00 0
2004-08-16 Perforation 1620.00 1620.50 13
2004-08-16 Packing Device Capped w/Cement 1608.00 1617.00 0
2004-08-17 Perforation 1551.50 1552.00 13
2004-08-17 Packing Device Capped w/Cement 1540.00 1549.00 0
2004-08-18 Perforation 980.00 980.50 13
2004-08-18 Packing Device Capped w/Cement 969.00 978.00 0
2004-08-19 Perforation 893.00 893.50 13
2004-08-19 Perforation 869.00 869.50 13
2004-08-19 Packing Device Capped w/Cement 813.00 889.00 0
1982-12-20 Perforation 2246.50 2248.50 13
2004-08-21 Perforation 793.00 793.50 13
2004-08-21 Perforation 703.00 703.50 13
2004-08-22 Packing Device Capped w/Cement 780.00 790.00 0
2004-08-23 Packing Device Capped w/Cement 657.00 704.00 0
2004-08-23 Perforation 239.00 239.50 13
2004-08-23 Perforation 206.00 206.50 13
2004-08-23 Packing Device Capped w/Cement 155.00 236.00 0
1982-12-20 Fracture 2246.50 2248.50 0
1985-06-01 Cement Squeeze 2246.50 2248.50 0
1985-06-06 Perforation 2251.30 2252.30 13
1985-09-14 Fracture 2251.30 2252.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2498 0.0 0.0 0.0
1968 4582 0.0 0.0 0.0
1969 7594 0.0 0.0 0.0
1970 8349 0.0 0.0 0.0
1971 6555 0.0 0.0 0.0
1972 7796 0.0 0.0 0.0
1973 8392 0.0 0.0 0.0
1974 7967 0.0 0.0 0.0
1975 6457 0.0 0.0 0.0
1976 6479 0.0 0.0 0.0
1977 5872 0.0 0.0 0.0
1978 6054 0.0 0.0 0.0
1979 7847 0.0 0.0 0.0
1980 7701 0.0 0.0 0.0
1981 7835 0.0 0.0 0.0
1982 6070 0.0 0.0 0.0
1983 8246 0.0 0.0 0.0
1984 6715 0.0 0.0 0.0
1985 5465 0.0 0.0 0.0
1986 6313 0.0 0.0 0.0
1987 2722 0.0 0.0 0.0
1988 455 0.0 0.0 0.0
1989 6010 0.0 0.0 0.0
1990 1748 0.0 0.0 0.0
1991 3594 0.0 0.0 0.0
1992 711 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 2116 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 873 0.0 0.0 0.0
1998 6841 0.0 0.0 0.0
1999 7164 0.0 0.0 0.0
2000 8211 0.0 0.0 0.0
2001 8092 0.0 0.0 0.0
2002 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1954-02-23 Lost Circulation 51.20 56.30

For data sources see[6]

References