X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455012510002

Well Details

Well ID: 0455012510002
Loading map...
Location: 00/10-25-045-01W5/2
Location Alias: 00/10-25-45-01 W5M
Location Alias 2: 00/10-25-045-01 W5/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 01
Section: 25
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 11-25-45-1
Operator Name: Cenovus Energy Inc.
License Number: 0008631
License Date: 1954-10-28
License Status: RecCertified
Spud Date: 1954-12-13
Final Drill Date: 1994-03-26
Well Total Depth: 2544.00 m
Surface Hole Latitude: 52.910678
Surface Hole Longitude: -114.016866

For data sources see[1][2]

Well History

Date Event
1954-10-28 Obtained License
1994-03-05 Direction Drilling Operation Performed - Horizontal
1994-03-14 Liner Casing Operation Performed
1994-03-26 Finished Drilling
1994-03-26 Perforation Treatment Performed - Open-Hole Completion
1994-03-26 Well Mode changed to Drilled and Cased
1994-03-27 Well Log Performed
1994-03-29 Rig Released
1994-04-08 Well Began Production
1994-04-08 Well Fluid changed to Crude Oil
1994-04-08 Well Mode changed to Flowing
1994-04-20 Well Log Performed
2000-08-01 Well Fluid changed to Crude Oil
2000-08-01 Well Mode changed to Suspended
2003-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-18 Plug Back Performed
2003-03-18 Well Fluid changed to Crude Oil
2003-03-18 Well Mode changed to Abandoned Zone
2003-03-19 Perforation Treatment Performed - Jet Perforation
2003-03-19 Well Log Performed
2003-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-20 Perforation Treatment Performed - Cement Squeeze
2003-03-20 Plug Back Performed
2003-03-21 Well Abandoned
2003-03-21 Well Fluid changed to Crude Oil
2003-03-21 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-03-05 2131.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-26 Open Hole/Barefoot Completion 2323.70 2544.00 0
2003-03-18 Packing Device Capped w/Cement 2265.00 2313.00 0
2003-03-19 Perforation 235.00 235.50 17
2003-03-20 Cement Squeeze 235.00 235.50 0
2003-03-20 Packing Device Capped w/Cement 217.00 232.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 892 0.0 0.0 0.0
1995 8100 0.0 0.0 0.0
1996 6452 0.0 0.0 0.0
1997 151 0.0 0.0 0.0

For data sources see[6]

References