X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455021601000

Well Details

Well ID: 0455021601000
Loading map...
Location: 00/01-16-045-02W5/0
Location Alias: 00/01-16-45-02 W5M
Location Alias 2: 00/01-16-045-02 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 02
Section: 16
County/Municipality: County of Wetaskiwin No. 10
Well Name: BAYTEX HZ 1A PEMBINA 1-16-45-2
Operator Name: Baytex Energy Ltd.
License Number: 0492620
License Date: 2018-12-06
License Status: Issued
Spud Date: 2019-02-23
Final Drill Date: 2019-03-07
Well Total Depth: 6038.00 m
Surface Hole Latitude: 52.905547
Surface Hole Longitude: -114.225406

For data sources see[1][2]

Well History

Date Event
2018-12-06 Obtained License
2019-02-24 Surface Casing Operation Performed
2019-02-27 Direction Drilling Operation Performed - Deviate
2019-03-01 Direction Drilling Operation Performed - Horizontal
2019-03-01 Well Log Performed
2019-03-07 Finished Drilling
2019-03-07 Well Log Performed
2019-03-07 Well Mode changed to Drilled and Cased
2019-03-09 Production Casing Operation Performed
2019-03-11 Well Log Performed
2019-03-17 Well Log Performed
2019-03-18 Perforation Treatment Performed - Jet Perforation
2019-03-18 Perforation Treatment Performed - Open-Hole Completion
2019-03-18 Rig Released
2019-03-23 Perforation Treatment Performed - Jet Perforation
2019-03-23 Perforation Treatment Performed - Remedial Casing
2019-03-25 Perforation Treatment Performed - Cement Squeeze
2019-03-25 Perforation Treatment Performed - Jet Perforation
2019-03-26 Perforation Treatment Performed - Jet Perforation
2019-03-27 Perforation Treatment Performed - Jet Perforation
2019-03-27 Well Log Performed
2019-03-28 Perforation Treatment Performed - Jet Perforation
2019-03-30 Perforation Treatment Performed - Jet Perforation
2019-03-30 Perforation Treatment Performed - Remedial Casing
2019-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-31 Perforation Treatment Performed - Jet Perforation
2019-03-31 Plug Back Performed
2019-04-01 Perforation Treatment Performed - Jet Perforation
2019-04-01 Perforation Treatment Performed - Remedial Casing
2019-04-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-04-03 Perforation Treatment Performed - Jet Perforation
2019-04-03 Perforation Treatment Performed - Remedial Casing
2019-04-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-04-05 Plug Back Performed
2019-04-05 Well Mode changed to Abandoned Zone

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-22 Savanna Drilling Corp. 652 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-27 2231.90 Deviate (5 - 79 degrees)
2019-03-01 2715.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-18 Open Hole/Barefoot Completion 3544.00 6038.00 0
2019-03-26 Perforation 2010.00 2011.00 17
2019-03-27 Perforation 940.00 941.00 17
2019-03-28 Perforation 1828.00 1829.00 17
2019-03-30 Perforation 1829.00 2011.00 17
2019-03-30 Remedial Casing Cementing 1829.00 2011.00 0
2019-03-31 Packing Device Capped w/Cement 1780.00 1840.00 0
2019-03-31 Perforation 1754.00 1755.00 17
2019-03-31 Perforation 1700.00 1701.00 17
2019-03-31 Packing Device Capped w/Cement 1728.00 1744.00 0
2019-04-01 Perforation 1829.00 2011.00 17
2019-03-18 Perforation 2206.00 2207.00 17
2019-04-01 Remedial Casing Cementing 1829.00 2011.00 0
2019-04-02 Packing Device Capped w/Cement 1682.00 1690.00 0
2019-04-03 Perforation 1675.00 1676.00 17
2019-04-03 Perforation 987.00 988.00 17
2019-04-03 Packing Device Capped w/Cement 1660.00 1668.00 0
2019-04-03 Perforation 987.00 1676.00 17
2019-04-03 Remedial Casing Cementing 987.00 1676.00 0
2019-04-05 Packing Device Capped w/Cement 922.00 930.00 0
2019-03-18 Perforation 2285.00 2286.00 17
2019-03-18 Perforation 2302.00 2303.00 17
2019-03-18 Perforation 2315.00 2318.00 17
2019-03-23 Perforation 2315.00 3544.00 17
2019-03-23 Remedial Casing Cementing 2315.00 3544.00 0
2019-03-25 Perforation 2023.50 2340.00 17
2019-03-25 Cement Squeeze 2023.50 2340.00 0

For data sources see[6]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-07 No Incident Encountered 0.00 0.00
2019-03-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References