X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050301000

Well Details

Well ID: 0455050301000
Loading map...
Location: 00/01-03-045-05W5/0
Location Alias: 00/01-03-45-05 W5M
Location Alias 2: 00/01-03-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 1-3-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0431061
License Date: 2011-02-02
License Status: Issued
Spud Date: 2011-03-11
Final Drill Date: 2011-03-19
Well Total Depth: 2895.00 m
Surface Hole Latitude: 52.857567
Surface Hole Longitude: -114.638786

For data sources see[1][2]

Well History

Date Event
2011-02-02 Obtained License
2011-03-13 Surface Casing Operation Performed
2011-03-14 Well Log Performed
2011-03-15 Direction Drilling Operation Performed - Horizontal
2011-03-19 Finished Drilling
2011-03-19 Well Mode changed to Drilled and Cased
2011-03-22 Production Casing Operation Performed
2011-03-22 Rig Released
2011-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-09 Perforation Treatment Performed - Open-Hole Completion
2011-09-13 Well Log Performed
2011-10-27 Well Began Production
2011-10-27 Well Fluid changed to Crude Oil
2011-10-27 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-15 1322.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-09 Open Hole/Barefoot Completion 2894.80 2895.00 0
2011-09-09 Multi-Stage Fracture 2359.80 2360.00 0
2011-09-09 Multi-Stage Fracture 2299.20 2299.40 0
2011-09-09 Multi-Stage Fracture 2238.20 2238.40 0
2011-09-09 Multi-Stage Fracture 2163.90 2164.10 0
2011-09-09 Multi-Stage Fracture 2105.70 2105.90 0
2011-09-09 Multi-Stage Fracture 2045.70 2045.90 0
2011-09-09 Multi-Stage Fracture 1984.80 1985.00 0
2011-09-09 Multi-Stage Fracture 1914.00 1914.20 0
2011-09-09 Multi-Stage Fracture 1853.30 1853.50 0
2011-09-09 Multi-Stage Fracture 2860.00 2860.20 0
2011-09-09 Multi-Stage Fracture 2799.40 2799.60 0
2011-09-09 Multi-Stage Fracture 2738.90 2739.10 0
2011-09-09 Multi-Stage Fracture 2677.90 2678.10 0
2011-09-09 Multi-Stage Fracture 2603.30 2603.50 0
2011-09-09 Multi-Stage Fracture 2542.30 2542.50 0
2011-09-09 Multi-Stage Fracture 2481.60 2481.80 0
2011-09-09 Multi-Stage Fracture 2421.00 2421.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1517 0.0 0.0 0.0
2012 8364 0.0 0.0 0.0
2013 8203 0.0 0.0 0.0
2014 8242 0.0 0.0 0.0
2015 7798 0.0 0.0 0.0
2016 8040 0.0 0.0 0.0
2017 8481 0.0 0.0 0.0
2018 8710 0.0 0.0 0.0
2019 8707 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References