X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050501000

Well Details

Well ID: 0455050501000
Loading map...
Location: 00/01-05-045-05W5/0
Location Alias: 00/01-05-45-05 W5M
Location Alias 2: 00/01-05-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 05
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 1-5-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0439604
License Date: 2011-11-24
License Status: Issued
Spud Date: 2011-12-12
Final Drill Date: 2011-12-18
Well Total Depth: 3279.00 m
Surface Hole Latitude: 52.861004
Surface Hole Longitude: -114.685561

For data sources see[1][2]

Well History

Date Event
2011-11-24 Obtained License
2011-12-13 Surface Casing Operation Performed
2011-12-14 Direction Drilling Operation Performed - Horizontal
2011-12-18 Finished Drilling
2011-12-18 Well Log Performed
2011-12-18 Well Mode changed to Drilled and Cased
2011-12-19 Production Casing Operation Performed
2011-12-19 Rig Released
2012-01-26 Well Log Performed
2012-02-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-02 Perforation Treatment Performed - Open-Hole Completion
2012-03-14 Well Began Production
2012-03-14 Well Fluid changed to Crude Oil
2012-03-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-14 1340.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-02 Open Hole/Barefoot Completion 3269.50 3279.00 0
2012-02-02 Multi-Stage Fracture 2666.70 2666.80 0
2012-02-02 Multi-Stage Fracture 2597.50 2597.60 0
2012-02-02 Multi-Stage Fracture 2528.30 2528.40 0
2012-02-02 Multi-Stage Fracture 2458.90 2459.00 0
2012-02-02 Multi-Stage Fracture 2389.60 2389.70 0
2012-02-02 Multi-Stage Fracture 2320.40 2320.50 0
2012-02-02 Multi-Stage Fracture 1929.00 1929.10 0
2012-02-02 Multi-Stage Fracture 3235.40 3235.50 0
2012-02-02 Multi-Stage Fracture 3166.30 3166.40 0
2012-02-02 Multi-Stage Fracture 3083.80 3083.90 0
2012-02-02 Multi-Stage Fracture 3014.30 3014.40 0
2012-02-02 Multi-Stage Fracture 2944.80 2944.90 0
2012-02-02 Multi-Stage Fracture 2875.10 2875.20 0
2012-02-02 Multi-Stage Fracture 2805.70 2805.80 0
2012-02-02 Multi-Stage Fracture 2736.20 2736.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6526 0.0 0.0 0.0
2013 8111 0.0 0.0 0.0
2014 8481 0.0 0.0 0.0
2015 8119 0.0 0.0 0.0
2016 7952 0.0 0.0 0.0
2017 8587 0.0 0.0 0.0
2018 8576 0.0 0.0 0.0
2019 8713 0.0 0.0 0.0
2020 2163 0.0 0.0 0.0

For data sources see[6]

References