X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050502000

Well Details

Well ID: 0455050502000
Loading map...
Location: 00/02-05-045-05W5/0
Location Alias: 00/02-05-45-05 W5M
Location Alias 2: 00/02-05-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 05
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 2-5-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0439603
License Date: 2011-11-24
License Status: Issued
Spud Date: 2012-01-03
Final Drill Date: 2012-01-11
Well Total Depth: 3265.00 m
Surface Hole Latitude: 52.861008
Surface Hole Longitude: -114.685784

For data sources see[1][2]

Well History

Date Event
2011-11-24 Obtained License
2012-01-04 Surface Casing Operation Performed
2012-01-06 Direction Drilling Operation Performed - Horizontal
2012-01-11 Finished Drilling
2012-01-11 Well Log Performed
2012-01-11 Well Mode changed to Drilled and Cased
2012-01-12 Production Casing Operation Performed
2012-01-13 Rig Released
2012-01-31 Well Log Performed
2012-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-06 Perforation Treatment Performed - Open-Hole Completion
2012-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-14 Well Began Production
2012-03-14 Well Fluid changed to Crude Oil
2012-03-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-03 Precision Drilling Corporation 196 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-06 1326.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-06 Open Hole/Barefoot Completion 3255.20 3265.00 0
2012-02-06 Multi-Stage Fracture 2596.70 2596.80 0
2012-02-06 Multi-Stage Fracture 2503.60 2503.70 0
2012-02-07 Multi-Stage Fracture 2436.40 2436.50 0
2012-02-07 Multi-Stage Fracture 2356.30 2356.40 0
2012-02-07 Multi-Stage Fracture 2289.10 2289.20 0
2012-02-07 Multi-Stage Fracture 2196.00 2196.10 0
2012-02-07 Multi-Stage Fracture 2141.70 2141.80 0
2012-02-07 Multi-Stage Fracture 2048.60 2048.70 0
2012-02-07 Multi-Stage Fracture 1968.40 1968.50 0
2012-02-06 Multi-Stage Fracture 3198.90 3199.00 0
2012-02-06 Multi-Stage Fracture 3143.80 3143.90 0
2012-02-06 Multi-Stage Fracture 3050.70 3050.80 0
2012-02-06 Multi-Stage Fracture 2983.60 2983.70 0
2012-02-06 Multi-Stage Fracture 2903.40 2903.50 0
2012-02-06 Multi-Stage Fracture 2811.30 2811.40 0
2012-02-06 Multi-Stage Fracture 2744.10 2744.20 0
2012-02-06 Multi-Stage Fracture 2663.90 2664.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6755 0.0 0.0 0.0
2013 8111 0.0 0.0 0.0
2014 8481 0.0 0.0 0.0
2015 8150 0.0 0.0 0.0
2016 8638 0.0 0.0 0.0
2017 8508 0.0 0.0 0.0
2018 7475 0.0 0.0 0.0
2019 8743 0.0 0.0 0.0
2020 2147 0.0 0.0 0.0

For data sources see[7]

References