X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050604000

Well Details

Well ID: 0455050604000
Loading map...
Location: 00/04-06-045-05W5/0
Location Alias: 00/04-06-45-05 W5M
Location Alias 2: 00/04-06-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 06
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 4-6-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0436725
License Date: 2011-09-12
License Status: Issued
Spud Date: 2011-10-30
Final Drill Date: 2011-11-06
Well Total Depth: 3153.00 m
Surface Hole Latitude: 52.847948
Surface Hole Longitude: -114.703476

For data sources see[1][2]

Well History

Date Event
2011-09-12 Obtained License
2011-10-30 Lost Circulation Occurred
2011-10-31 Surface Casing Operation Performed
2011-11-02 Direction Drilling Operation Performed - Horizontal
2011-11-06 Finished Drilling
2011-11-06 Well Mode changed to Drilled and Cased
2011-11-09 Production Casing Operation Performed
2011-11-09 Rig Released
2011-12-19 Well Log Performed
2012-01-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-05 Perforation Treatment Performed - Open-Hole Completion
2012-01-08 Well Log Performed
2012-02-10 Well Began Production
2012-02-10 Well Fluid changed to Crude Oil
2012-02-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-02 1355.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-05 Open Hole/Barefoot Completion 3140.20 3153.00 0
2012-01-05 Multi-Stage Fracture 2529.70 2530.00 0
2012-01-05 Multi-Stage Fracture 2433.00 2433.30 0
2012-01-05 Multi-Stage Fracture 2403.50 2403.80 0
2012-01-05 Multi-Stage Fracture 2306.60 2306.90 0
2012-01-05 Multi-Stage Fracture 2223.30 2223.60 0
2012-01-05 Multi-Stage Fracture 2180.30 2180.60 0
2012-01-05 Multi-Stage Fracture 2097.00 2097.30 0
2012-01-05 Multi-Stage Fracture 2027.30 2027.60 0
2012-01-05 Multi-Stage Fracture 1957.40 1957.70 0
2012-01-05 Multi-Stage Fracture 3122.00 3122.30 0
2012-01-05 Multi-Stage Fracture 3054.90 3055.20 0
2012-01-05 Multi-Stage Fracture 2948.40 2948.70 0
2012-01-05 Multi-Stage Fracture 2891.90 2892.20 0
2012-01-05 Multi-Stage Fracture 2822.30 2822.60 0
2012-01-05 Multi-Stage Fracture 2739.30 2739.60 0
2012-01-05 Multi-Stage Fracture 2669.60 2669.90 0
2012-01-05 Multi-Stage Fracture 2599.60 2599.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6694 0.0 0.0 0.0
2013 8243 0.0 0.0 0.0
2014 8402 0.0 0.0 0.0
2015 8241 0.0 0.0 0.0
2016 8356 0.0 0.0 0.0
2017 7756 0.0 0.0 0.0
2018 8258 0.0 0.0 0.0
2019 8051 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-10-30 Lost Circulation 49.00 601.00

For data sources see[7]

References