X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050704000

Well Details

Well ID: 0455050704000
Loading map...
Location: 00/04-07-045-05W5/0
Location Alias: 00/04-07-45-05 W5M
Location Alias 2: 00/04-07-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 07
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 4-7-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0425281
License Date: 2010-10-28
License Status: Issued
Spud Date: 2010-12-31
Final Drill Date: 2011-01-12
Well Total Depth: 3100.00 m
Surface Hole Latitude: 52.874380
Surface Hole Longitude: -114.722535

For data sources see[1][2]

Well History

Date Event
2010-10-28 Obtained License
2011-01-03 Surface Casing Operation Performed
2011-01-05 Direction Drilling Operation Performed - Horizontal
2011-01-08 Well Log Performed
2011-01-12 Finished Drilling
2011-01-12 Well Log Performed
2011-01-12 Well Mode changed to Drilled and Cased
2011-01-14 Well Log Performed
2011-01-16 Production Casing Operation Performed
2011-01-16 Rig Released
2011-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-21 Perforation Treatment Performed - Open-Hole Completion
2011-02-22 Well Log Performed
2011-02-26 Well Log Performed
2011-02-28 Well Log Performed
2011-04-02 Well Began Production
2011-04-02 Well Fluid changed to Crude Oil
2011-04-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-05 1345.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-21 Open Hole/Barefoot Completion 3096.30 3100.00 0
2011-02-21 Multi-Stage Fracture 2465.20 2465.30 0
2011-02-21 Multi-Stage Fracture 2409.00 2409.10 0
2011-02-21 Multi-Stage Fracture 2352.30 2352.40 0
2011-02-21 Multi-Stage Fracture 2295.60 2295.70 0
2011-02-21 Multi-Stage Fracture 2238.90 2239.00 0
2011-02-21 Multi-Stage Fracture 2182.10 2182.20 0
2011-02-21 Multi-Stage Fracture 2127.50 2127.60 0
2011-02-21 Multi-Stage Fracture 2072.50 2072.60 0
2011-02-21 Multi-Stage Fracture 2003.10 2003.20 0
2011-02-21 Multi-Stage Fracture 1946.50 1946.60 0
2011-02-21 Multi-Stage Fracture 3064.20 3064.30 0
2011-02-21 Multi-Stage Fracture 1889.80 1889.90 0
2011-02-21 Multi-Stage Fracture 1846.10 1846.20 0
2011-02-21 Multi-Stage Fracture 2994.90 2995.00 0
2011-02-21 Multi-Stage Fracture 2936.70 2936.80 0
2011-02-21 Multi-Stage Fracture 2881.50 2881.60 0
2011-02-21 Multi-Stage Fracture 2810.70 2810.80 0
2011-02-21 Multi-Stage Fracture 2647.90 2648.00 0
2011-02-21 Multi-Stage Fracture 2591.30 2591.40 0
2011-02-21 Multi-Stage Fracture 2534.60 2534.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6418 0.0 0.0 0.0
2012 7955 0.0 0.0 0.0
2013 8215 0.0 0.0 0.0
2014 8450 0.0 0.0 0.0
2015 8138 0.0 0.0 0.0
2016 8735 0.0 0.0 0.0
2017 8552 0.0 0.0 0.0
2018 7486 0.0 0.0 0.0
2019 8609 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

References