X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455051013000

Well Details

Well ID: 0455051013000
Loading map...
Location: 00/13-10-045-05W5/0
Location Alias: 00/13-10-45-05 W5M
Location Alias 2: 00/13-10-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 13-10-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0437258
License Date: 2011-09-29
License Status: Issued
Spud Date: 2011-11-22
Final Drill Date: 2011-11-29
Well Total Depth: 3045.00 m
Surface Hole Latitude: 52.859430
Surface Hole Longitude: -114.647921

For data sources see[1][2]

Well History

Date Event
2011-09-29 Obtained License
2011-11-23 Surface Casing Operation Performed
2011-11-24 Direction Drilling Operation Performed - Horizontal
2011-11-29 Finished Drilling
2011-11-29 Well Log Performed
2011-11-29 Well Mode changed to Drilled and Cased
2011-11-30 Production Casing Operation Performed
2011-11-30 Rig Released
2012-01-15 Well Log Performed
2012-01-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-16 Perforation Treatment Performed - Open-Hole Completion
2012-02-22 Well Began Production
2012-02-22 Well Fluid changed to Crude Oil
2012-02-22 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-24 1339.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-16 Open Hole/Barefoot Completion 3035.60 3045.00 0
2012-01-16 Multi-Stage Fracture 2447.70 2447.90 0
2012-01-16 Multi-Stage Fracture 2380.80 2381.00 0
2012-01-16 Multi-Stage Fracture 2338.00 2338.20 0
2012-01-16 Multi-Stage Fracture 2259.50 2259.70 0
2012-01-16 Multi-Stage Fracture 2176.90 2177.10 0
2012-01-16 Multi-Stage Fracture 2097.00 2097.20 0
2012-01-16 Multi-Stage Fracture 2067.20 2067.40 0
2012-01-16 Multi-Stage Fracture 1987.00 1987.20 0
2012-01-16 Multi-Stage Fracture 1905.10 1905.30 0
2012-01-16 Multi-Stage Fracture 3002.50 3002.70 0
2012-01-16 Multi-Stage Fracture 2932.90 2933.10 0
2012-01-16 Multi-Stage Fracture 2865.40 2865.60 0
2012-01-16 Multi-Stage Fracture 2796.40 2796.60 0
2012-01-16 Multi-Stage Fracture 2726.40 2726.60 0
2012-01-16 Multi-Stage Fracture 2673.80 2674.00 0
2012-01-16 Multi-Stage Fracture 2581.80 2582.00 0
2012-01-16 Multi-Stage Fracture 2513.90 2514.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7112 0.0 0.0 0.0
2013 7686 0.0 0.0 0.0
2014 8464 0.0 0.0 0.0
2015 8005 0.0 0.0 0.0
2016 7878 0.0 0.0 0.0
2017 8080 0.0 0.0 0.0
2018 8642 0.0 0.0 0.0
2019 8555 0.0 0.0 0.0
2020 2099 0.0 0.0 0.0

For data sources see[6]

References