X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455051014000

Well Details

Well ID: 0455051014000
Loading map...
Location: 00/14-10-045-05W5/0
Location Alias: 00/14-10-45-05 W5M
Location Alias 2: 00/14-10-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 14-10-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0437261
License Date: 2011-09-29
License Status: Issued
Spud Date: 2011-12-02
Final Drill Date: 2011-12-07
Well Total Depth: 3012.00 m
Surface Hole Latitude: 52.859470
Surface Hole Longitude: -114.647707

For data sources see[1][2]

Well History

Date Event
2011-09-29 Obtained License
2011-12-03 Surface Casing Operation Performed
2011-12-04 Direction Drilling Operation Performed - Horizontal
2011-12-07 Finished Drilling
2011-12-07 Well Log Performed
2011-12-07 Well Mode changed to Drilled and Cased
2011-12-08 Production Casing Operation Performed
2011-12-08 Rig Released
2012-01-09 Well Log Performed
2012-01-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-11 Perforation Treatment Performed - Open-Hole Completion
2012-02-22 Well Began Production
2012-02-22 Well Fluid changed to Crude Oil
2012-02-22 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-04 1339.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-11 Open Hole/Barefoot Completion 3004.40 3012.00 0
2012-01-11 Multi-Stage Fracture 2446.30 2446.40 0
2012-01-11 Multi-Stage Fracture 2377.10 2377.20 0
2012-01-11 Multi-Stage Fracture 2307.70 2307.80 0
2012-01-11 Multi-Stage Fracture 2252.40 2252.50 0
2012-01-11 Multi-Stage Fracture 2182.80 2182.90 0
2012-01-11 Multi-Stage Fracture 2126.60 2126.70 0
2012-01-11 Multi-Stage Fracture 2057.10 2057.20 0
2012-01-11 Multi-Stage Fracture 1987.60 1987.70 0
2012-01-11 Multi-Stage Fracture 1904.60 1904.70 0
2012-01-11 Multi-Stage Fracture 2972.10 2972.20 0
2012-01-11 Multi-Stage Fracture 2917.00 2917.10 0
2012-01-11 Multi-Stage Fracture 2847.90 2848.00 0
2012-01-11 Multi-Stage Fracture 2778.80 2778.90 0
2012-01-11 Multi-Stage Fracture 2696.70 2696.80 0
2012-01-11 Multi-Stage Fracture 2640.30 2640.40 0
2012-01-11 Multi-Stage Fracture 2584.80 2584.90 0
2012-01-11 Multi-Stage Fracture 2502.60 2502.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7175 0.0 0.0 0.0
2013 7503 0.0 0.0 0.0
2014 8428 0.0 0.0 0.0
2015 7510 0.0 0.0 0.0
2016 8268 0.0 0.0 0.0
2017 8235 0.0 0.0 0.0
2018 8662 0.0 0.0 0.0
2019 8212 0.0 0.0 0.0
2020 1920 0.0 0.0 0.0

For data sources see[6]

References