X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455051416000

Well Details

Well ID: 0455051416000
Loading map...
Location: 00/16-14-045-05W5/0
Location Alias: 00/16-14-45-05 W5M
Location Alias 2: 00/16-14-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 14
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 16-14-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0425378
License Date: 2010-11-02
License Status: Suspension
Spud Date: 2010-11-20
Final Drill Date: 2010-12-06
Well Total Depth: 3210.00 m
Surface Hole Latitude: 52.888392
Surface Hole Longitude: -114.631776

For data sources see[1][2]

Well History

Date Event
2010-11-02 Obtained License
2010-11-23 Surface Casing Operation Performed
2010-11-27 Direction Drilling Operation Performed - Horizontal
2010-12-06 Finished Drilling
2010-12-06 Well Mode changed to Drilled and Cased
2010-12-08 Production Casing Operation Performed
2010-12-08 Rig Released
2011-01-16 Well Log Performed
2011-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-20 Perforation Treatment Performed - Open-Hole Completion
2011-01-27 Well Log Performed
2011-03-09 Well Began Production
2011-03-09 Well Fluid changed to Crude Oil
2011-03-09 Well Mode changed to Pumping
2019-02-01 Well Fluid changed to Crude Oil
2019-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-27 1301.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-20 Open Hole/Barefoot Completion 3204.00 3210.00 0
2011-01-20 Multi-Stage Fracture 2654.00 2654.10 0
2011-01-20 Multi-Stage Fracture 2584.00 2584.10 0
2011-01-20 Multi-Stage Fracture 2528.00 2528.10 0
2011-01-20 Multi-Stage Fracture 2458.00 2458.10 0
2011-01-20 Multi-Stage Fracture 2402.00 2402.10 0
2011-01-20 Multi-Stage Fracture 2332.00 2332.10 0
2011-01-20 Multi-Stage Fracture 2263.00 2263.10 0
2011-01-20 Multi-Stage Fracture 2206.00 2206.10 0
2011-01-20 Multi-Stage Fracture 2137.00 2137.10 0
2011-01-20 Multi-Stage Fracture 2080.00 2080.10 0
2011-01-20 Multi-Stage Fracture 3171.80 3171.90 0
2011-01-20 Multi-Stage Fracture 2011.00 2011.10 0
2011-01-20 Multi-Stage Fracture 1942.00 1942.10 0
2011-01-20 Multi-Stage Fracture 3102.00 3102.10 0
2011-01-20 Multi-Stage Fracture 3045.00 3045.10 0
2011-01-20 Multi-Stage Fracture 2976.00 2976.10 0
2011-01-20 Multi-Stage Fracture 2906.00 2906.10 0
2011-01-20 Multi-Stage Fracture 2850.00 2850.10 0
2011-01-20 Multi-Stage Fracture 2780.00 2780.10 0
2011-01-20 Multi-Stage Fracture 2724.00 2724.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6720 0.0 0.0 0.0
2012 8615 0.0 0.0 0.0
2013 8550 0.0 0.0 0.0
2014 8516 0.0 0.0 0.0
2015 7231 0.0 0.0 0.0
2016 7364 0.0 0.0 0.0

For data sources see[6]

References