X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455052206022

Well Details

Well ID: 0455052206022
Loading map...
Location: 02/06-22-045-05W5/2
Location Alias: 02/06-22-45-05 W5M
Location Alias 2: 02/06-22-045-05 W5/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 22
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 6-22-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0110702
License Date: 1984-11-12
License Status: Suspension
Spud Date: 1984-12-03
Final Drill Date: 1984-12-18
Well Total Depth: 1947.00 m
Surface Hole Latitude: 52.891668
Surface Hole Longitude: -114.647280

For data sources see[1][2]

Well History

Date Event
1984-11-12 Obtained License
1984-12-03 Lost Circulation Occurred
1984-12-04 Surface Casing Operation Performed
1984-12-18 Finished Drilling
1984-12-18 Well Log Performed
1984-12-19 Well Log Performed
1984-12-20 Production Casing Operation Performed
1984-12-21 Rig Released
1985-01-31 Well Log Performed
1985-02-01 Perforation Treatment Performed - Jet Perforation
1985-03-07 Well Log Performed
1985-03-09 Perforation Treatment Performed - Jet Perforation
1985-03-09 Well Mode changed to Drilled and Cased
1985-03-11 Perforation Treatment Performed - Fractured
1985-06-22 Well Log Performed
1985-06-23 Perforation Treatment Performed - Jet Perforation
1985-06-26 Perforation Treatment Performed - Fractured
1985-06-26 Well Log Performed
1985-11-15 Perforation Treatment Performed - Cement Squeeze
1985-11-15 Plug Back Performed
1985-11-23 Well Fluid changed to Crude Oil
1985-11-23 Well Mode changed to Potential
1985-11-24 Perforation Treatment Performed - Cement Squeeze
1985-11-24 Plug Back Performed
1985-11-24 Well Fluid changed to Crude Oil
1985-11-24 Well Mode changed to Abandoned Zone
2003-03-09 Well Log Performed
2003-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-10 Perforation Treatment Performed - Jet Perforation
2003-03-10 Plug Back Performed
2003-03-10 Well Log Performed
2003-03-12 Perforation Treatment Performed - Remedial Casing
2003-03-13 Well Log Performed
2003-03-14 Perforation Treatment Performed - Jet Perforation
2003-03-14 Well Log Performed
2003-03-15 Perforation Treatment Performed - Remedial Casing
2003-03-16 Perforation Treatment Performed - Jet Perforation
2003-03-16 Well Log Performed
2011-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-02-01 Perforation 1895.00 1896.60 13
2003-03-12 Remedial Casing Cementing 878.00 879.00 0
2003-03-14 Perforation 844.00 845.00 17
2003-03-15 Remedial Casing Cementing 844.00 845.00 0
2003-03-16 Perforation 829.50 837.00 17
2011-10-23 Packing Device Capped w/Cement 813.50 821.50 0
1985-03-09 Perforation 1617.00 1619.00 13
1985-03-11 Fracture 1617.00 1619.00 0
1985-06-23 Perforation 1287.00 1292.00 13
1985-06-26 Fracture 1287.00 1292.00 0
1985-11-15 Cement Squeeze 1287.00 1292.00 0
1985-11-24 Cement Squeeze 1617.00 1619.00 0
2003-03-10 Packing Device Capped w/Cement 1877.00 1885.00 0
2003-03-10 Perforation 878.00 879.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 719 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-12-03 Lost Circulation 185.20 185.20

For data sources see[6]

References