If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455052206022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.891668,"lon":-114.64728,"icon":""}]} |
Location: 02/06-22-045-05W5/2 | |
Location Alias: 02/06-22-45-05 W5M | |
Location Alias 2: 02/06-22-045-05 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 05 | |
Section: 22 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC PEMBINA 6-22-45-5 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0110702 | |
License Date: 1984-11-12 | |
License Status: Suspension | |
Spud Date: 1984-12-03 | |
Final Drill Date: 1984-12-18 | |
Well Total Depth: 1947.00 m | |
Surface Hole Latitude: 52.891668 | |
Surface Hole Longitude: -114.647280 |
Date | Event |
---|---|
1984-11-12 | Obtained License |
1984-12-03 | Lost Circulation Occurred |
1984-12-04 | Surface Casing Operation Performed |
1984-12-18 | Finished Drilling |
1984-12-18 | Well Log Performed |
1984-12-19 | Well Log Performed |
1984-12-20 | Production Casing Operation Performed |
1984-12-21 | Rig Released |
1985-01-31 | Well Log Performed |
1985-02-01 | Perforation Treatment Performed - Jet Perforation |
1985-03-07 | Well Log Performed |
1985-03-09 | Perforation Treatment Performed - Jet Perforation |
1985-03-09 | Well Mode changed to Drilled and Cased |
1985-03-11 | Perforation Treatment Performed - Fractured |
1985-06-22 | Well Log Performed |
1985-06-23 | Perforation Treatment Performed - Jet Perforation |
1985-06-26 | Perforation Treatment Performed - Fractured |
1985-06-26 | Well Log Performed |
1985-11-15 | Perforation Treatment Performed - Cement Squeeze |
1985-11-15 | Plug Back Performed |
1985-11-23 | Well Fluid changed to Crude Oil |
1985-11-23 | Well Mode changed to Potential |
1985-11-24 | Perforation Treatment Performed - Cement Squeeze |
1985-11-24 | Plug Back Performed |
1985-11-24 | Well Fluid changed to Crude Oil |
1985-11-24 | Well Mode changed to Abandoned Zone |
2003-03-09 | Well Log Performed |
2003-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-03-10 | Perforation Treatment Performed - Jet Perforation |
2003-03-10 | Plug Back Performed |
2003-03-10 | Well Log Performed |
2003-03-12 | Perforation Treatment Performed - Remedial Casing |
2003-03-13 | Well Log Performed |
2003-03-14 | Perforation Treatment Performed - Jet Perforation |
2003-03-14 | Well Log Performed |
2003-03-15 | Perforation Treatment Performed - Remedial Casing |
2003-03-16 | Perforation Treatment Performed - Jet Perforation |
2003-03-16 | Well Log Performed |
2011-10-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-02-01 | Perforation | 1895.00 | 1896.60 | 13 |
2003-03-12 | Remedial Casing Cementing | 878.00 | 879.00 | 0 |
2003-03-14 | Perforation | 844.00 | 845.00 | 17 |
2003-03-15 | Remedial Casing Cementing | 844.00 | 845.00 | 0 |
2003-03-16 | Perforation | 829.50 | 837.00 | 17 |
2011-10-23 | Packing Device Capped w/Cement | 813.50 | 821.50 | 0 |
1985-03-09 | Perforation | 1617.00 | 1619.00 | 13 |
1985-03-11 | Fracture | 1617.00 | 1619.00 | 0 |
1985-06-23 | Perforation | 1287.00 | 1292.00 | 13 |
1985-06-26 | Fracture | 1287.00 | 1292.00 | 0 |
1985-11-15 | Cement Squeeze | 1287.00 | 1292.00 | 0 |
1985-11-24 | Cement Squeeze | 1617.00 | 1619.00 | 0 |
2003-03-10 | Packing Device Capped w/Cement | 1877.00 | 1885.00 | 0 |
2003-03-10 | Perforation | 878.00 | 879.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 719 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1984-12-03 | Lost Circulation | 185.20 | 185.20 |
For data sources see[6]