X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455052306000

Well Details

Well ID: 0455052306000
Loading map...
Location: 00/06-23-045-05W5/0
Location Alias: 00/06-23-45-05 W5M
Location Alias 2: 00/06-23-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 23
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 6-23-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0126575
License Date: 1987-05-25
License Status: Suspension
Spud Date: 1987-06-07
Final Drill Date: 1987-06-21
Well Total Depth: 2125.00 m
Surface Hole Latitude: 52.891455
Surface Hole Longitude: -114.621930

For data sources see[1][2]

Well History

Date Event
1987-05-25 Obtained License
1987-06-08 Surface Casing Operation Performed
1987-06-21 Finished Drilling
1987-06-21 Well Log Performed
1987-06-21 Well Mode changed to Drilled and Cased
1987-06-23 Production Casing Operation Performed
1987-06-24 Rig Released
1987-07-08 Well Log Performed
1987-07-09 Perforation Treatment Performed - Jet Perforation
1987-07-17 Well Began Production
1987-07-17 Well Fluid changed to Crude Oil
1987-07-17 Well Mode changed to Flowing
1987-12-11 Well Fluid changed to Crude Oil
1987-12-11 Well Mode changed to Pumping
1995-07-01 Well Fluid changed to Crude Oil
1995-07-01 Well Mode changed to Suspended
1995-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-18 Plug Back Performed
1995-11-18 Well Fluid changed to Crude Oil
1995-11-18 Well Mode changed to Abandoned Zone
1995-11-19 Perforation Treatment Performed - Jet Perforation
2011-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-07-09 Perforation 1900.40 1901.60 13
1995-11-18 Packing Device Capped w/Cement 1885.00 1893.00 0
1995-11-19 Perforation 1195.00 1198.00 13
2011-12-21 Packing Device Capped w/Cement 1179.00 1187.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 1684 0.0 0.0 0.0
1988 2676 0.0 0.0 0.0
1989 4716 0.0 0.0 0.0
1990 7908 0.0 0.0 0.0
1991 7642 0.0 0.0 0.0
1992 8662 0.0 0.0 0.0
1993 1715 0.0 0.0 0.0

For data sources see[5]

References