If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455060307020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.850065,"lon":-114.749882,"icon":""}]} |
Location: 02/07-03-045-06W5/0 | |
Location Alias: 02/07-03-45-06 W5M | |
Location Alias 2: 02/07-03-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 03 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC HZ 02 MINHIK 7-3-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0476115 | |
License Date: 2015-07-13 | |
License Status: Issued | |
Spud Date: 2015-08-01 | |
Final Drill Date: 2015-08-09 | |
Well Total Depth: 4104.00 m | |
Surface Hole Latitude: 52.850065 | |
Surface Hole Longitude: -114.749882 |
Date | Event |
---|---|
2015-07-13 | Obtained License |
2015-08-02 | Surface Casing Operation Performed |
2015-08-03 | Direction Drilling Operation Performed - Deviate |
2015-08-04 | Direction Drilling Operation Performed - Horizontal |
2015-08-09 | Finished Drilling |
2015-08-09 | Well Log Performed |
2015-08-09 | Well Mode changed to Drilled and Cased |
2015-08-10 | Production Casing Operation Performed |
2015-08-10 | Rig Released |
2015-09-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-09 | Well Began Production |
2015-09-09 | Well Fluid changed to Crude Oil |
2015-09-09 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-08-01 | Excalibur Drilling Ltd. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-08-03 | 674.40 | Deviate (5 - 79 degrees) |
2015-08-04 | 1798.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-09-05 | Multi-Stage Fracture | 4100.00 | 4100.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3650.00 | 3651.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3600.00 | 3601.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3550.00 | 3551.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3500.00 | 3501.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3450.00 | 3451.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3400.00 | 3401.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3350.00 | 3351.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3300.00 | 3301.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3250.00 | 3251.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3102.00 | 3103.90 | 0 |
2015-09-05 | Multi-Stage Fracture | 4050.00 | 4051.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3047.00 | 3048.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2992.00 | 2993.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2937.00 | 2938.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2882.00 | 2883.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2827.00 | 2828.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2772.00 | 2773.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2717.00 | 2718.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2661.00 | 2662.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2606.00 | 2607.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2552.00 | 2553.90 | 0 |
2015-09-05 | Multi-Stage Fracture | 4000.00 | 4001.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2550.00 | 2551.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2500.00 | 2501.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2496.00 | 2497.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2450.00 | 2451.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 2442.00 | 2443.90 | 0 |
2015-09-07 | Multi-Stage Fracture | 2400.00 | 2401.90 | 0 |
2015-09-07 | Multi-Stage Fracture | 2350.00 | 2351.90 | 0 |
2015-09-07 | Multi-Stage Fracture | 2300.00 | 2301.90 | 0 |
2015-09-07 | Multi-Stage Fracture | 2250.00 | 2251.90 | 0 |
2015-09-07 | Multi-Stage Fracture | 2200.00 | 2201.90 | 0 |
2015-09-05 | Multi-Stage Fracture | 3950.00 | 3951.90 | 0 |
2015-09-07 | Multi-Stage Fracture | 2150.00 | 2151.90 | 0 |
2015-09-07 | Multi-Stage Fracture | 2100.00 | 2101.90 | 0 |
2015-09-07 | Multi-Stage Fracture | 2050.00 | 2051.90 | 0 |
2015-09-05 | Multi-Stage Fracture | 3900.00 | 3901.90 | 0 |
2015-09-05 | Multi-Stage Fracture | 3850.00 | 3851.90 | 0 |
2015-09-05 | Multi-Stage Fracture | 3800.00 | 3801.90 | 0 |
2015-09-05 | Multi-Stage Fracture | 3750.00 | 3751.90 | 0 |
2015-09-06 | Multi-Stage Fracture | 3700.00 | 3701.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-05 | 2015-09-07 | 1,696 | 3,761 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 81.4387 | N/A | |||
Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 13.6845 | N/A | ||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 4.5598 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0101 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0101 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0101 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0101 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0101 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1791 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1791 | N/A | ||||
GNE-2 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0415 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0415 | N/A | ||||
FR-12 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0859 | N/A | |
anionic polyacrylamide copolymer | 25987-30-8 | 100 | 0.0859 | N/A | ||||
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0859 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-08-01 | 2015-08-04 | Groundwater - Non-saline less than or equal to 150m deep | 572 |
2015-08-14 | 2015-08-25 | Groundwater - Non-saline less than or equal to 150m deep | 737 |
2015-08-10 | 2015-08-23 | Groundwater - Non-saline less than or equal to 150m deep | 2178 |
2015-08-01 | 2015-08-04 | Groundwater - Non-saline less than or equal to 150m deep | 898 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 2376 | 0.0 | 0.0 | 0.0 |
2016 | 8704 | 0.0 | 0.0 | 0.0 |
2017 | 8136 | 0.0 | 0.0 | 0.0 |
2018 | 8565 | 0.0 | 0.0 | 0.0 |
2019 | 8630 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-08-10 | No Incident Encountered | 0.00 | 0.00 |
2015-09-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]