If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455060604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.859241,"lon":-114.863434,"icon":""}]} |
Location: 00/04-06-045-06W5/0 | |
Location Alias: 00/04-06-45-06 W5M | |
Location Alias 2: 00/04-06-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 06 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC WILLGR 4-6-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0439629 | |
License Date: 2011-11-24 | |
License Status: Issued | |
Spud Date: 2012-01-22 | |
Final Drill Date: 2012-01-31 | |
Well Total Depth: 3229.00 m | |
Surface Hole Latitude: 52.859241 | |
Surface Hole Longitude: -114.863434 |
Date | Event |
---|---|
2011-11-24 | Obtained License |
2012-01-24 | Surface Casing Operation Performed |
2012-01-26 | Direction Drilling Operation Performed - Horizontal |
2012-01-27 | Well Log Performed |
2012-01-31 | Finished Drilling |
2012-01-31 | Well Log Performed |
2012-01-31 | Well Mode changed to Drilled and Cased |
2012-02-01 | Production Casing Operation Performed |
2012-02-01 | Rig Released |
2012-03-04 | Well Log Performed |
2012-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-07 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-17 | Well Log Performed |
2012-06-25 | Well Began Production |
2012-06-25 | Well Fluid changed to Crude Oil |
2012-06-25 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-22 | Precision Drilling Corporation | 196 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-26 | 1463.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-07 | Open Hole/Barefoot Completion | 3214.30 | 3229.00 | 0 |
2012-03-13 | Multi-Stage Fracture | 2529.20 | 2529.30 | 0 |
2012-03-13 | Multi-Stage Fracture | 2459.30 | 2459.40 | 0 |
2012-03-14 | Multi-Stage Fracture | 2402.80 | 2402.90 | 0 |
2012-03-14 | Multi-Stage Fracture | 2319.50 | 2319.60 | 0 |
2012-03-14 | Multi-Stage Fracture | 2249.70 | 2249.80 | 0 |
2012-03-14 | Multi-Stage Fracture | 2179.80 | 2179.90 | 0 |
2012-03-14 | Multi-Stage Fracture | 2123.40 | 2123.50 | 0 |
2012-03-14 | Multi-Stage Fracture | 2053.60 | 2053.70 | 0 |
2012-03-14 | Multi-Stage Fracture | 1983.80 | 1983.90 | 0 |
2012-03-07 | Multi-Stage Fracture | 3155.60 | 3155.70 | 0 |
2012-03-07 | Multi-Stage Fracture | 3086.10 | 3086.20 | 0 |
2012-03-07 | Multi-Stage Fracture | 2975.80 | 2975.90 | 0 |
2012-03-07 | Multi-Stage Fracture | 2905.90 | 2906.00 | 0 |
2012-03-07 | Multi-Stage Fracture | 2835.90 | 2836.00 | 0 |
2012-03-13 | Multi-Stage Fracture | 2765.90 | 2766.00 | 0 |
2012-03-13 | Multi-Stage Fracture | 2669.10 | 2669.20 | 0 |
2012-03-13 | Multi-Stage Fracture | 2612.60 | 2612.70 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4310 | 0.0 | 0.0 | 0.0 |
2013 | 8683 | 0.0 | 0.0 | 0.0 |
2014 | 8317 | 0.0 | 0.0 | 0.0 |
2015 | 8530 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8591 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8664 | 0.0 | 0.0 | 0.0 |
2020 | 2127 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]