X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455060714020

Well Details

Well ID: 0455060714020
Loading map...
Location: 02/14-07-045-06W5/0
Location Alias: 02/14-07-45-06 W5M
Location Alias 2: 02/14-07-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 07
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC WILLGR 14-7-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0434547
License Date: 2011-06-22
License Status: Issued
Spud Date: 2011-08-27
Final Drill Date: 2011-09-04
Well Total Depth: 3071.00 m
Surface Hole Latitude: 52.859608
Surface Hole Longitude: -114.862851

For data sources see[1][2]

Well History

Date Event
2011-06-22 Obtained License
2011-08-28 Surface Casing Operation Performed
2011-08-30 Direction Drilling Operation Performed - Horizontal
2011-09-04 Finished Drilling
2011-09-04 Well Mode changed to Drilled and Cased
2011-09-06 Production Casing Operation Performed
2011-09-07 Rig Released
2011-09-27 Well Log Performed
2011-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-30 Perforation Treatment Performed - Open-Hole Completion
2011-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-01 Well Began Production
2011-12-01 Well Fluid changed to Crude Oil
2011-12-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-30 1450.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-30 Open Hole/Barefoot Completion 3060.90 3071.00 0
2011-10-04 Multi-Stage Fracture 2502.50 2502.60 0
2011-10-04 Multi-Stage Fracture 2427.90 2428.00 0
2011-10-04 Multi-Stage Fracture 2355.10 2355.20 0
2011-10-04 Multi-Stage Fracture 2295.00 2295.10 0
2011-10-04 Multi-Stage Fracture 2221.60 2221.70 0
2011-10-04 Multi-Stage Fracture 2120.20 2120.30 0
2011-10-04 Multi-Stage Fracture 2045.60 2045.70 0
2011-10-04 Multi-Stage Fracture 1971.20 1971.30 0
2011-10-04 Multi-Stage Fracture 1910.00 1910.10 0
2011-09-30 Multi-Stage Fracture 3040.00 3040.10 0
2011-09-30 Multi-Stage Fracture 2955.10 2955.20 0
2011-09-30 Multi-Stage Fracture 2880.70 2880.80 0
2011-09-30 Multi-Stage Fracture 2808.20 2808.30 0
2011-09-30 Multi-Stage Fracture 2720.20 2720.30 0
2011-10-03 Multi-Stage Fracture 2645.40 2645.50 0
2011-10-04 Multi-Stage Fracture 2611.10 2611.20 0
2011-10-04 Multi-Stage Fracture 2563.60 2563.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 724 0.0 0.0 0.0
2012 8350 0.0 0.0 0.0
2013 8460 0.0 0.0 0.0
2014 8357 0.0 0.0 0.0
2015 8512 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8472 0.0 0.0 0.0
2020 2103 0.0 0.0 0.0

For data sources see[6]

References