If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455060904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.863464,"lon":-114.797727,"icon":""}]} |
Location: 00/04-09-045-06W5/0 | |
Location Alias: 00/04-09-45-06 W5M | |
Location Alias 2: 00/04-09-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 09 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC PEMBINA 4-9-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0444405 | |
License Date: 2012-02-23 | |
License Status: Issued | |
Spud Date: 2012-07-31 | |
Final Drill Date: 2012-08-07 | |
Well Total Depth: 3280.00 m | |
Surface Hole Latitude: 52.863464 | |
Surface Hole Longitude: -114.797727 |
Date | Event |
---|---|
2012-02-23 | Obtained License |
2012-07-31 | Lost Circulation Occurred |
2012-08-01 | Surface Casing Operation Performed |
2012-08-02 | Direction Drilling Operation Performed - Deviate |
2012-08-04 | Direction Drilling Operation Performed - Horizontal |
2012-08-04 | Well Log Performed |
2012-08-07 | Finished Drilling |
2012-08-07 | Well Log Performed |
2012-08-07 | Well Mode changed to Drilled and Cased |
2012-08-08 | Production Casing Operation Performed |
2012-08-08 | Rig Released |
2012-10-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-11 | Perforation Treatment Performed - Open-Hole Completion |
2012-11-12 | Well Began Production |
2012-11-12 | Well Fluid changed to Crude Oil |
2012-11-12 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-31 | Precision Drilling Corporation | 196 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-02 | 1328.00 | Deviate (5 - 79 degrees) |
2012-08-04 | 1867.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-11 | Open Hole/Barefoot Completion | 3272.00 | 3280.00 | 0 |
2012-10-11 | Multi-Stage Fracture | 2588.20 | 2588.30 | 0 |
2012-10-11 | Multi-Stage Fracture | 2519.00 | 2519.10 | 0 |
2012-10-11 | Multi-Stage Fracture | 2435.70 | 2435.80 | 0 |
2012-10-11 | Multi-Stage Fracture | 2339.80 | 2339.90 | 0 |
2012-10-11 | Multi-Stage Fracture | 2256.60 | 2256.70 | 0 |
2012-10-11 | Multi-Stage Fracture | 2200.20 | 2200.30 | 0 |
2012-10-11 | Multi-Stage Fracture | 2116.90 | 2117.00 | 0 |
2012-10-11 | Multi-Stage Fracture | 2020.20 | 2020.30 | 0 |
2012-10-11 | Multi-Stage Fracture | 1937.10 | 1937.20 | 0 |
2012-10-11 | Multi-Stage Fracture | 3226.80 | 3226.90 | 0 |
2012-10-11 | Multi-Stage Fracture | 3143.70 | 3143.80 | 0 |
2012-10-11 | Multi-Stage Fracture | 3060.20 | 3060.30 | 0 |
2012-10-11 | Multi-Stage Fracture | 2977.50 | 2977.60 | 0 |
2012-10-11 | Multi-Stage Fracture | 2907.80 | 2907.90 | 0 |
2012-10-11 | Multi-Stage Fracture | 2824.40 | 2824.50 | 0 |
2012-10-11 | Multi-Stage Fracture | 2741.40 | 2741.50 | 0 |
2012-10-11 | Multi-Stage Fracture | 2671.40 | 2671.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1161 | 0.0 | 0.0 | 0.0 |
2013 | 8195 | 0.0 | 0.0 | 0.0 |
2014 | 8316 | 0.0 | 0.0 | 0.0 |
2015 | 8596 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8591 | 0.0 | 0.0 | 0.0 |
2018 | 8375 | 0.0 | 0.0 | 0.0 |
2019 | 2615 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-31 | Lost Circulation | 60.00 | 611.00 |
2012-11-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]