X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455061709000

Well Details

Well ID: 0455061709000
Loading map...
Location: 00/09-17-045-06W5/0
Location Alias: 00/09-17-45-06 W5M
Location Alias 2: 00/09-17-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 17
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 9-17-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0440104
License Date: 2011-12-01
License Status: Issued
Spud Date: 2012-02-02
Final Drill Date: 2012-02-15
Well Total Depth: 3015.00 m
Surface Hole Latitude: 52.884371
Surface Hole Longitude: -114.846409

For data sources see[1][2]

Well History

Date Event
2011-12-01 Obtained License
2012-02-04 Surface Casing Operation Performed
2012-02-05 Well Log Performed
2012-02-06 Direction Drilling Operation Performed - Horizontal
2012-02-11 Well Log Performed
2012-02-12 Well Log Performed
2012-02-15 Finished Drilling
2012-02-15 Well Log Performed
2012-02-15 Well Mode changed to Drilled and Cased
2012-02-17 Production Casing Operation Performed
2012-02-17 Rig Released
2012-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-01 Perforation Treatment Performed - Open-Hole Completion
2012-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-05 Well Log Performed
2012-08-09 Well Log Performed
2012-10-02 Well Began Production
2012-10-02 Well Fluid changed to Crude Oil
2012-10-02 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-02 Precision Drilling Corporation 371 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-06 784.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-01 Open Hole/Barefoot Completion 3004.80 3015.00 0
2012-08-02 Multi-Stage Fracture 2416.60 2416.70 0
2012-08-02 Multi-Stage Fracture 2366.90 2367.00 0
2012-08-02 Multi-Stage Fracture 2289.00 2289.10 0
2012-08-02 Multi-Stage Fracture 2225.20 2225.30 0
2012-08-02 Multi-Stage Fracture 2149.60 2149.70 0
2012-08-02 Multi-Stage Fracture 2099.80 2099.90 0
2012-08-02 Multi-Stage Fracture 2036.10 2036.20 0
2012-08-02 Multi-Stage Fracture 1944.10 1944.20 0
2012-08-02 Multi-Stage Fracture 1880.60 1880.70 0
2012-08-01 Multi-Stage Fracture 2968.60 2968.70 0
2012-08-01 Multi-Stage Fracture 2890.90 2891.00 0
2012-08-01 Multi-Stage Fracture 2841.20 2841.30 0
2012-08-01 Multi-Stage Fracture 2763.20 2763.30 0
2012-08-01 Multi-Stage Fracture 2699.50 2699.60 0
2012-08-01 Multi-Stage Fracture 2635.80 2635.90 0
2012-08-01 Multi-Stage Fracture 2557.90 2558.00 0
2012-08-02 Multi-Stage Fracture 2494.20 2694.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2124 0.0 0.0 0.0
2013 8713 0.0 0.0 0.0
2014 8424 0.0 0.0 0.0
2015 8577 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 8388 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-22 No Incident Encountered 0.00 0.00

For data sources see[8]

References