If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455061812000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.884236,"lon":-114.846409,"icon":""}]} |
Location: 00/12-18-045-06W5/0 | |
Location Alias: 00/12-18-45-06 W5M | |
Location Alias 2: 00/12-18-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 18 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC PEMBINA 12-18-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0439532 | |
License Date: 2011-11-23 | |
License Status: Issued | |
Spud Date: 2012-01-16 | |
Final Drill Date: 2012-01-29 | |
Well Total Depth: 3217.00 m | |
Surface Hole Latitude: 52.884236 | |
Surface Hole Longitude: -114.846409 |
Date | Event |
---|---|
2011-11-23 | Obtained License |
2012-01-17 | Lost Circulation Occurred |
2012-01-18 | Surface Casing Operation Performed |
2012-01-20 | Well Log Performed |
2012-01-22 | Direction Drilling Operation Performed - Horizontal |
2012-01-23 | Well Log Performed |
2012-01-25 | Lost Circulation Occurred |
2012-01-29 | Finished Drilling |
2012-01-29 | Well Log Performed |
2012-01-29 | Well Mode changed to Drilled and Cased |
2012-01-31 | Production Casing Operation Performed |
2012-01-31 | Rig Released |
2012-07-21 | Well Log Performed |
2012-07-31 | Well Log Performed |
2012-08-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-06 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-10 | Well Log Performed |
2012-10-02 | Well Began Production |
2012-10-02 | Well Fluid changed to Crude Oil |
2012-10-02 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-16 | Predator Drilling Inc. | 371 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-22 | 1320.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-06 | Open Hole/Barefoot Completion | 3150.00 | 3217.00 | 0 |
2012-08-08 | Multi-Stage Fracture | 2311.20 | 2311.30 | 0 |
2012-08-08 | Multi-Stage Fracture | 2217.10 | 2217.20 | 0 |
2012-08-08 | Multi-Stage Fracture | 2156.70 | 2156.80 | 0 |
2012-08-08 | Multi-Stage Fracture | 2067.30 | 2067.40 | 0 |
2012-08-08 | Multi-Stage Fracture | 2005.80 | 2005.90 | 0 |
2012-08-08 | Multi-Stage Fracture | 1944.30 | 1944.40 | 0 |
2012-08-08 | Multi-Stage Fracture | 1842.30 | 1842.40 | 0 |
2012-08-06 | Multi-Stage Fracture | 2938.00 | 2938.10 | 0 |
2012-08-06 | Multi-Stage Fracture | 2836.10 | 2836.20 | 0 |
2012-08-06 | Multi-Stage Fracture | 2761.10 | 2761.20 | 0 |
2012-08-06 | Multi-Stage Fracture | 2686.10 | 2686.20 | 0 |
2012-08-06 | Multi-Stage Fracture | 2611.10 | 2611.20 | 0 |
2012-08-06 | Multi-Stage Fracture | 2522.70 | 2522.80 | 0 |
2012-08-06 | Multi-Stage Fracture | 2474.70 | 2474.80 | 0 |
2012-08-06 | Multi-Stage Fracture | 2386.20 | 2386.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2000 | 0.0 | 0.0 | 0.0 |
2013 | 8620 | 0.0 | 0.0 | 0.0 |
2014 | 8472 | 0.0 | 0.0 | 0.0 |
2015 | 7894 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8591 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-01-17 | Lost Circulation | 301.00 | 609.00 |
2012-01-25 | Lost Circulation | 2395.00 | 3217.00 |
2012-08-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]