X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455062816003

Well Details

Well ID: 0455062816003
Loading map...
Location: 00/16-28-045-06W5/3
Location Alias: 00/16-28-45-06 W5M
Location Alias 2: 00/16-28-045-06 W5/03
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 28
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC MINHIK 16-28-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0097990
License Date: 1982-10-15
License Status: Abandoned
Spud Date: 1982-10-22
Final Drill Date: 1982-11-04
Well Total Depth: 1959.00 m
Surface Hole Latitude: 52.916196
Surface Hole Longitude: -114.800044

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-10-15 Obtained License
1982-11-01 Drill Stem Test Performed
1982-11-02 Drill Stem Test Performed
1982-11-04 Finished Drilling
1982-11-04 Well Mode changed to Drilled and Cased
1982-11-05 Drill Stem Test Performed
1982-11-08 Production Casing Operation Performed
1982-12-04 Perforation Treatment Performed - Jet Perforation
1982-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-05-30 Perforation Treatment Performed - Fractured
1983-06-05 Perforation Treatment Performed - Jet Perforation
1983-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-08 Perforation Treatment Performed - Fractured
1990-10-11 Perforation Treatment Performed - Cement Squeeze
1990-10-11 Plug Back Performed
1990-10-15 Perforation Treatment Performed - Jet Perforation
1990-10-15 Well Log Performed
1990-10-16 Perforation Treatment Performed - Fractured
1990-12-05 Well Began Production
1990-12-05 Well Fluid changed to Crude Oil
1990-12-05 Well Mode changed to Flowing
1994-04-30 Well Fluid changed to Crude Oil
1994-04-30 Well Mode changed to Suspended
1997-06-20 Well Log Performed
1997-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-22 Perforation Treatment Performed - Jet Perforation
1997-06-22 Plug Back Performed
1997-06-22 Well Log Performed
1997-06-25 Perforation Treatment Performed - Remedial Casing
1997-06-26 Well Abandoned
1997-06-26 Well Fluid changed to Crude Oil
1997-06-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-12-04 Perforation 1877.50 1879.50 13
1997-06-22 Packing Device Capped w/Cement 1860.00 1863.00 0
1997-06-22 Packing Device Capped w/Cement 1568.00 1576.00 0
1997-06-22 Perforation 480.00 480.80 13
1997-06-25 Remedial Casing Cementing 480.00 480.80 0
1982-12-12 Acid Treatment 1877.50 1879.50 0
1983-05-30 Fracture 1877.50 1879.50 0
1983-06-05 Perforation 1210.00 1215.00 13
1983-06-06 Acid Treatment 1210.00 1215.00 0
1983-06-08 Fracture 1210.00 1215.00 0
1990-10-11 Cement Squeeze 1210.00 1215.00 0
1990-10-15 Perforation 1584.50 1588.00 10
1990-10-16 Fracture 1584.50 1588.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 540 0.0 0.0 0.0
1991 744 0.0 0.0 0.0

For data sources see[5]

References