If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455063206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.90892,"lon":-114.843172,"icon":""}]} |
Location: 00/06-32-045-06W5/0 | |
Location Alias: 00/06-32-45-06 W5M | |
Location Alias 2: 00/06-32-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 32 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: WHITECAP PEMBINA 6-32-45-6 | |
Operator Name: Whitecap Resources Inc. | |
License Number: 0444508 | |
License Date: 2012-02-27 | |
License Status: Issued | |
Spud Date: 2012-03-05 | |
Final Drill Date: 2012-03-15 | |
Well Total Depth: 3243.00 m | |
Surface Hole Latitude: 52.908920 | |
Surface Hole Longitude: -114.843172 |
Date | Event |
---|---|
2012-02-27 | Obtained License |
2012-03-06 | Surface Casing Operation Performed |
2012-03-07 | Direction Drilling Operation Performed - Deviate |
2012-03-09 | Direction Drilling Operation Performed - Horizontal |
2012-03-09 | Well Log Performed |
2012-03-10 | Intermediate Casing Operation Performed |
2012-03-15 | Finished Drilling |
2012-03-15 | Well Mode changed to Drilled and Cased |
2012-03-16 | Liner Casing Operation Performed |
2012-03-16 | Well Began Production |
2012-03-16 | Well Fluid changed to Crude Oil |
2012-03-16 | Well Log Performed |
2012-03-16 | Well Mode changed to Pumping |
2012-03-17 | Rig Released |
2012-03-18 | Well Log Performed |
2012-03-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-22 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-05 | Nabors Drilling Limited | 12 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-07 | 1346.00 | Deviate (5 - 79 degrees) |
2012-03-09 | 1692.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-22 | Open Hole/Barefoot Completion | 3241.00 | 3243.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 2542.50 | 2542.60 | 0 |
2012-03-23 | Multi-Stage Fracture | 2366.50 | 2366.60 | 0 |
2012-03-23 | Multi-Stage Fracture | 2291.40 | 2291.50 | 0 |
2012-03-23 | Multi-Stage Fracture | 2202.40 | 2202.50 | 0 |
2012-03-23 | Multi-Stage Fracture | 2127.30 | 2127.40 | 0 |
2012-03-23 | Multi-Stage Fracture | 2038.00 | 2038.10 | 0 |
2012-03-23 | Multi-Stage Fracture | 1962.70 | 1962.80 | 0 |
2012-03-23 | Multi-Stage Fracture | 1874.10 | 1874.20 | 0 |
2012-03-23 | Multi-Stage Fracture | 1798.90 | 1799.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 3202.90 | 3203.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 3110.50 | 3110.60 | 0 |
2012-03-22 | Multi-Stage Fracture | 3035.80 | 3035.90 | 0 |
2012-03-22 | Multi-Stage Fracture | 2946.40 | 2946.50 | 0 |
2012-03-22 | Multi-Stage Fracture | 2871.50 | 2871.60 | 0 |
2012-03-22 | Multi-Stage Fracture | 2782.10 | 2782.20 | 0 |
2012-03-22 | Multi-Stage Fracture | 2706.90 | 2707.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 2617.80 | 2617.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6635 | 0.0 | 0.0 | 0.0 |
2013 | 8576 | 0.0 | 0.0 | 0.0 |
2014 | 8742 | 0.0 | 0.0 | 0.0 |
2015 | 8639 | 0.0 | 0.0 | 0.0 |
2016 | 8567 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8749 | 0.0 | 0.0 | 0.0 |
2019 | 8724 | 0.0 | 0.0 | 0.0 |
2020 | 2148 | 0.0 | 0.0 | 0.0 |
For data sources see[7]