X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455063214002

Well Details

Well ID: 0455063214002
Loading map...
Location: 00/14-32-045-06W5/2
Location Alias: 00/14-32-45-06 W5M
Location Alias 2: 00/14-32-045-06 W5/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 32
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 14-32-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0099707
License Date: 1982-12-10
License Status: Suspension
Spud Date: 1982-12-27
Final Drill Date: 1983-01-11
Well Total Depth: 1905.00 m
Surface Hole Latitude: 52.928111
Surface Hole Longitude: -114.839788

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-12-10 Obtained License
1983-01-04 Well Log Performed
1983-01-05 Drill Stem Test Performed
1983-01-11 Finished Drilling
1983-01-11 Well Log Performed
1983-01-11 Well Mode changed to Drilled and Cased
1983-01-12 Drill Stem Test Performed
1983-01-14 Liner Casing Operation Performed
1983-01-19 Perforation Treatment Performed - Jet Perforation
1983-01-31 Perforation Treatment Performed - Fractured
1983-05-19 Perforation Treatment Performed - Jet Perforation
1983-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-05-22 Perforation Treatment Performed - Fractured
1983-05-26 Perforation Treatment Performed - Jet Perforation
1983-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-05-29 Perforation Treatment Performed - Fractured
1983-06-14 Well Began Production
1983-06-14 Well Fluid changed to Crude Oil
1983-06-14 Well Mode changed to Flowing
1985-02-28 Well Fluid changed to Crude Oil
1985-02-28 Well Mode changed to Suspended
1985-03-25 Well Log Performed
1995-07-29 Perforation Treatment Performed - Cement Squeeze
1995-07-29 Plug Back Performed
1995-07-29 Well Fluid changed to Crude Oil
1995-07-29 Well Mode changed to Abandoned Zone
1995-07-30 Perforation Treatment Performed - Jet Perforation
1995-07-30 Well Log Performed
2009-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-01-19 Perforation 1880.00 1882.00 13
1995-07-30 Perforation 1227.00 1231.50 10
2009-06-19 Packing Device Capped w/Cement 1117.00 1125.00 0
2009-06-19 Packing Device Capped w/Cement 1207.00 1215.00 0
1983-01-31 Fracture 1880.00 1882.00 0
1983-05-19 Perforation 1585.00 1588.00 13
1983-05-20 Acid Treatment 1585.00 1588.00 0
1983-05-22 Fracture 1585.00 1588.00 0
1983-05-26 Perforation 1135.00 1140.00 13
1983-05-27 Acid Treatment 1135.00 1140.00 0
1983-05-29 Fracture 1135.00 1140.00 0
1995-07-29 Cement Squeeze 1585.00 1588.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3409 0.0 0.0 0.0
1984 8378 0.0 0.0 0.0
1985 864 0.0 0.0 0.0

For data sources see[5]

References