If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455063505002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.921691,"lon":-114.768755,"icon":""}]} |
Location: 00/05-35-045-06W5/2 | |
Location Alias: 00/05-35-45-06 W5M | |
Location Alias 2: 00/05-35-045-06 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 35 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC PEMBINA 5-35-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0078843 | |
License Date: 1979-10-25 | |
License Status: Suspension | |
Spud Date: 1979-11-16 | |
Final Drill Date: 1979-11-30 | |
Well Total Depth: 1587.00 m | |
Surface Hole Latitude: 52.921691 | |
Surface Hole Longitude: -114.768755 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-10-25 | Obtained License |
1979-11-25 | Well Log Performed |
1979-11-26 | Drill Stem Test Performed |
1979-11-27 | Drill Stem Test Performed |
1979-11-30 | Finished Drilling |
1979-11-30 | Well Log Performed |
1979-11-30 | Well Mode changed to Drilled and Cased |
1979-12-03 | Production Casing Operation Performed |
1980-01-04 | Perforation Treatment Performed - Jet Perforation |
1980-01-10 | Perforation Treatment Performed - Fractured |
1980-03-24 | Perforation Treatment Performed - Jet Perforation |
1980-03-27 | Perforation Treatment Performed - Fractured |
2010-10-16 | Well Log Performed |
2010-12-16 | Perforation Treatment Performed - Fractured |
2010-12-21 | Well Began Production |
2010-12-21 | Well Fluid changed to Crude Oil |
2010-12-21 | Well Mode changed to Pumping |
2019-02-01 | Well Fluid changed to Crude Oil |
2019-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-01-04 | Perforation | 1554.50 | 1557.00 | 13 |
1980-01-10 | Fracture | 1554.50 | 1557.00 | 0 |
1980-03-24 | Perforation | 1134.50 | 1139.50 | 13 |
1980-03-27 | Fracture | 1134.50 | 1139.50 | 0 |
2010-12-16 | Fracture | 1134.50 | 1139.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 648 | 0.0 | 0.0 | 0.0 |
2010 | 298 | 0.0 | 0.0 | 0.0 |
2011 | 5163 | 0.0 | 0.0 | 0.0 |
2012 | 2544 | 0.0 | 0.0 | 0.0 |
2013 | 8255 | 0.0 | 0.0 | 0.0 |
For data sources see[5]