X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455063512000

Well Details

Well ID: 0455063512000
Loading map...
Location: 00/12-35-045-06W5/0
Location Alias: 00/12-35-45-06 W5M
Location Alias 2: 00/12-35-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 35
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 12-35-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0081958
License Date: 1980-04-01
License Status: Suspension
Spud Date: 1980-04-04
Final Drill Date: 1980-04-14
Well Total Depth: 1585.00 m
Surface Hole Latitude: 52.927157
Surface Hole Longitude: -114.769736

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-01 Obtained License
1980-04-09 Drill Stem Test Performed
1980-04-09 Well Log Performed
1980-04-10 Drill Stem Test Performed
1980-04-14 Finished Drilling
1980-04-14 Well Mode changed to Drilled and Cased
1980-04-16 Production Casing Operation Performed
1980-04-30 Perforation Treatment Performed - Jet Perforation
1980-05-01 Perforation Treatment Performed - Fractured
1980-05-08 Perforation Treatment Performed - Jet Perforation
1980-05-09 Perforation Treatment Performed - Fractured
1980-05-17 Perforation Treatment Performed - Casing Patch (Over Perfs)
1980-08-14 Well Began Production
1980-08-14 Well Fluid changed to Crude Oil
1980-08-14 Well Mode changed to Pumping
1988-02-01 Well Fluid changed to Crude Oil
1988-02-01 Well Mode changed to Suspended
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Flowing
2000-06-28 Well Fluid changed to Crude Oil
2000-06-28 Well Mode changed to Suspended
2008-07-11 Well Fluid changed to Crude Oil
2008-07-11 Well Mode changed to Pumping
2010-11-29 Perforation Treatment Performed - Jet Perforation
2010-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-01 Perforation Treatment Performed - Jet Perforation
2010-12-01 Plug Back Performed
2010-12-01 Well Log Performed
2010-12-13 Well Fluid changed to Crude Oil
2010-12-13 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-04-30 Perforation 1552.00 1555.00 13
2010-11-29 Perforation 1192.00 1193.50 13
2010-11-29 Perforation 1201.00 1204.00 13
2010-12-01 Perforation 1196.00 1199.00 17
2010-12-01 Perforation 1201.00 1204.00 17
2010-12-01 Packing Device Capped w/Cement 1537.00 1545.00 0
2010-12-01 Perforation 1192.00 1194.00 17
1980-04-30 Perforation 1556.00 1557.00 13
1980-05-01 Fracture 1552.00 1557.00 0
1980-05-08 Perforation 1192.00 1193.50 13
1980-05-08 Perforation 1196.50 1198.50 13
1980-05-08 Perforation 1201.00 1204.00 13
1980-05-09 Fracture 1192.00 1204.00 0
1980-05-17 Casing Patch 1190.00 1205.80 0
2010-11-29 Perforation 1196.50 1198.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 3354 0.0 0.0 0.0
1981 7968 0.0 0.0 0.0
1982 7424 0.0 0.0 0.0
1983 8255 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 7884 0.0 0.0 0.0
1987 3503 0.0 0.0 0.0
1993 5447 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 3956 0.0 0.0 0.0
1996 8735 0.0 0.0 0.0
1997 8375 0.0 0.0 0.0
1998 3863 0.0 0.0 0.0
1999 1776 0.0 0.0 0.0
2008 4152 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8207 0.0 0.0 0.0

For data sources see[5]

References