X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464103512002

Well Details

Well ID: 0464103512002
Loading map...
Location: 00/12-35-046-10W4/2
Location Alias: 00/12-35-46-10 W4M
Location Alias 2: 00/12-35-046-10 W4/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 10
Section: 35
County/Municipality: Municipal District of Wainwright No. 61
Well Name: PINE CLIFF VIK-KINS 12-35-46-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0130110
License Date: 1987-11-13
License Status: Issued
Spud Date: 1987-12-02
Final Drill Date: 1987-12-04
Well Total Depth: 806.80 m
Surface Hole Latitude: 53.012614
Surface Hole Longitude: -111.357263

For data sources see[1][2]

Well History

Date Event
1987-11-13 Obtained License
1987-12-03 Surface Casing Operation Performed
1987-12-04 Finished Drilling
1987-12-04 Well Log Performed
1987-12-04 Well Mode changed to Drilled and Cased
1987-12-05 Production Casing Operation Performed
1987-12-05 Rig Released
1988-01-26 Perforation Treatment Performed - Jet Perforation
1988-01-26 Well Log Performed
1988-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-28 Plug Back Performed
1988-01-28 Well Log Performed
1988-01-29 Perforation Treatment Performed - Jet Perforation
2002-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-05 Plug Back Performed
2002-10-05 Well Log Performed
2002-10-06 Perforation Treatment Performed - Jet Perforation
2002-10-06 Well Log Performed
2002-10-15 Well Began Production
2002-10-15 Well Fluid changed to Gas
2002-10-15 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-01-26 Perforation 761.00 763.00 13
1988-01-26 Perforation 765.00 767.00 13
1988-01-26 Perforation 768.00 769.00 13
1988-01-26 Perforation 770.00 772.00 13
1988-01-28 Packing Device Capped w/Cement 750.80 758.00 0
1988-01-29 Perforation 725.00 728.00 13
2002-10-05 Packing Device Capped w/Cement 712.00 719.90 0
2002-10-06 Perforation 631.50 634.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1872 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7146 0.0 0.0 0.0
2008 8781 0.0 0.0 0.0
2009 8634 0.0 0.0 0.0
2010 8725 0.0 0.0 0.0
2011 8745 0.0 0.0 0.0
2012 5590 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8594 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References