X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464130406000

Well Details

Well ID: 0464130406000
Loading map...
Location: 00/06-04-046-13W4/0
Location Alias: 00/06-04-46-13 W4M
Location Alias 2: 00/06-04-046-13 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 13
Section: 04
County/Municipality: Flagstaff County
Well Name: PINE CLIFF KILLAMN 6-4-46-13
Operator Name: Pine Cliff Energy Ltd.
License Number: 0053150
License Date: 1975-03-04
License Status: Suspension
Spud Date: 1975-06-23
Final Drill Date: 1975-06-25
Well Total Depth: 894.60 m
Surface Hole Latitude: 52.935756
Surface Hole Longitude: -111.833562

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-03-04 Obtained License
1975-06-25 Drill Stem Test Performed
1975-06-25 Finished Drilling
1975-06-27 Drill Stem Test Performed
1975-06-28 Production Casing Operation Performed
1975-07-13 Perforation Treatment Performed - Jet Perforation
1975-07-13 Well Mode changed to Drilled and Cased
1976-06-01 Well Began Production
1976-06-01 Well Fluid changed to Gas
1976-06-01 Well Mode changed to Flowing
1982-08-20 Perforation Treatment Performed - Jet Perforation
1982-08-20 Well Fluid changed to Gas
1982-08-20 Well Mode changed to Flowing
1998-06-01 Well Fluid changed to Gas
1998-06-01 Well Mode changed to Suspended
2000-03-04 Well Fluid changed to Gas
2000-03-04 Well Mode changed to Flowing
2005-11-02 Perforation Treatment Performed - Jet Perforation
2005-11-03 Perforation Treatment Performed - Remedial Casing
2008-05-11 Well Log Performed
2009-03-01 Well Fluid changed to Gas
2009-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-13 Perforation 839.40 841.60 7
1982-08-20 Perforation 835.20 836.40 13
1982-08-20 Perforation 804.10 805.30 13
2005-11-02 Perforation 141.00 141.50 17
2005-11-03 Remedial Casing Cementing 141.00 141.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 4281 0.0 0.0 0.0
1977 7803 0.0 0.0 0.0
1978 7473 0.0 0.0 0.0
1979 7878 0.0 0.0 0.0
1980 3746 0.0 0.0 0.0
1981 7052 0.0 0.0 0.0
1982 8326 0.0 0.0 0.0
1983 8086 0.0 0.0 0.0
1984 7530 0.0 0.0 0.0
1985 6184 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 7349 0.0 0.0 0.0
1988 4370 0.0 0.0 0.0
1989 6610 0.0 0.0 0.0
1990 5077 0.0 0.0 0.0
1991 5469 0.0 0.0 0.0
1992 8339 0.0 0.0 0.0
1993 8729 0.0 0.0 0.0
1994 8676 0.0 0.0 0.0
1995 7730 0.0 0.0 0.0
1996 1922 0.0 0.0 0.0
2000 6854 0.0 0.0 0.0
2001 8383 0.0 0.0 0.0
2002 8265 0.0 0.0 0.0
2003 8122 0.0 0.0 0.0
2004 8584 0.0 0.0 0.0
2005 7915 0.0 0.0 0.0
2006 8707 0.0 0.0 0.0
2007 3383 0.0 0.0 0.0
2008 4651 0.0 0.0 0.0

For data sources see[5]

References